My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRRIP 2009 Invoices (3)
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
PRRIP 2009 Invoices (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2013 11:01:54 AM
Creation date
1/15/2013 3:31:58 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Platte River Recovery Implementation Program (PRRIP) Invoices for 2009 - Volume 3
State
CO
NE
WY
Basin
South Platte
Water Division
1
Date
1/1/2009
Author
Platte River Recovery Implementation Program (PRRIP)
Title
Platte River Recovery Implementation Program (PRRIP) Invoices for 2009 - Volume 3
Water Supply Pro - Doc Type
Budget
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROGRESS REPORT <br />Subject: Platte River Water Management Study #17 <br />Work completed through October S, 2009 <br />Prepared For: Jerry Kenny <br />Executive Director <br />Platte River Recovery Implementation Program <br />Prepared By: Jeff Bandy / Boyle Engineering AECOM Water <br />Date: October 8, 2009 <br />Distribution: Client: Executive Director <br />Boyle: Blaine Dwyer <br />File: 60060817/ 16930.00 -0002 <br />This Progress Report provides a summary of work performed under the Second Amendment to the Agreement <br />behveen the Nebraska Community Foundation, Inc. and Boyle Engineering for Engineering Services for the <br />Platte River Recovery Implementation Program Water Management Study (Phase II), dated February 18, 2009. <br />This Progress Report covers work performed through October 2, 2009. <br />AECOM provided assistance to the Executive Director's Office related to the Water Action Plan Update. This <br />effort was not included in the original scope of work, and is therefore added as Task 7 below and on the attached <br />budget summary page. <br />Work Performed /Work in Progress <br />The primary activities were performed for this billing period under the Second Amendment: <br />❑ Task 1: Kickoff Meeting <br />• Task Complete <br />❑ Task 2: WMS Spreadsheet Tool Training <br />• Task Complete <br />❑ Task 3: WMS Phase I and Phase II Assumptions Review <br />• Task Complete <br />❑ Task 4: WMS Sensitivity Analysis Modeling <br />• Task Complete <br />❑ Task 5: WMS Spreadsheet Tool Modifications Evaluation <br />• Task Complete <br />❑ Task 6: Final Documentation <br />0 Task Complete <br />❑ Task 7: Water Action Plan Update Assistance <br />• Review Water Action Plan (2001) regarding estimated yields at habitat <br />PRRIP PRGRPT17 10- 08- 09.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.