Laserfiche WebLink
SINCE DAMS <br />1948 E�'JMMM <br />February 10, 2003 <br />Rodney Reinhardt, President <br />Terrace Irrigation Company <br />10299 County Road DD <br />La Jara, Colorado 81140 <br />Re: Feasibility Study of Terrace <br />Reservoir Outlet Improvements <br />Dear Mr. Reinhardt: <br />As you requested, the purpose of this letter is to provide a tabulation of engineering cost for <br />preparation of a feasibility study and related engineering for improvement of Terrace Reservoir outlet <br />improvements. Some work is completed and some is yet to be completed. Following is a tabulation <br />of costs: <br />1. Preliminary site visit and project review $530 <br />2. Preparation of feasibility study $4,800 <br />3. Design and plans for trash rack replacement $3,500 <br />4. Construction review and preparation of "as- built" drawings $2,200 <br />Total $11,030 <br />The work involved in items 1 and 2 of the above tabulation of costs were required to submit an <br />application for a loan to the Colorado Water Conservation Board. Other costs are for engineering to <br />complete the construction of the trash rack replacement project. <br />If you have question or need more information, please contact me. <br />Sincerely, <br />Davis Engineering Service, Inc. <br />V <br />Jo Allen Davey, P.E. <br />131411` 944 - PD. $" 1940 - A&",. " - U w(. - 91101 - P4P, 0111) S91 -3004 - f,4 011) SRI-P12 <br />