My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150279 Project Summary
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150279 Project Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2013 11:59:10 AM
Creation date
1/8/2013 10:45:12 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150279
Contractor Name
Boulder White Rock Ditch and Reservoir Company
Contract Type
Loan
Water District
0
County
Boulder
Weld
Loan Projects - Doc Type
Project Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Boulder White Rock Ditch & Reservoir Company <br />PANAMA RESERVOIR OUTLET PROJECT <br />Project Description <br />The Boulder White Rock Ditch and Reservoir Company delivers irrigation water to land in Boulder and <br />Weld Counties. It diverts water from Boulder Creek in downtown Boulder through the Boulder White <br />Rock Ditch and stores water in two of its facilities: Six Mile Reservoir and Panama Reservoir. Due to recent <br />operational changes, the Company no longer exchanges water with nearby ditches and needed to improve <br />the flexibility in its own system to meets its shareholder's needs. The Company built a pump station at the <br />Panama Reservoir outlet in order to use water stored in the reservoir that was inaccessible through the <br />existing gravity outlet. <br />Project Data <br />Sponsor: Boulder White Rock Ditch & County: Boulder/Weld Water Source: Boulder Creek <br />Reservoir Company <br />Terms of Loan: $2,549,689.90 for 30 years @ 3.45% Substantial Completion: January 1, 2012 <br />Design Engineer: NRCS, Longmont and URS, Inc., Denver <br />Contractor: Krische Construction, Inc, Longmont <br />Project Elements: 32ft x 25ft Building, three 150UP vertical turbine pumps, 33ft deep wet well, 40001f of <br />PVC pipe, riprap and fill material around access road. <br />
The URL can be used to link to this page
Your browser does not support the video tag.