My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150222 PIF Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150222 PIF Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2012 10:46:54 AM
Creation date
12/11/2012 10:33:50 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150222
Contractor Name
Orchard Mesa Irrigation District
Contract Type
Loan
Water District
72
County
Mesa
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROMISSORY NOTE <br />Date: August 22, 2006 <br />Borrower: <br />Orchard Mesa Irrigation District <br />Principal Amount: <br />$545,400 <br />Interest Rate: <br />2.5% per annum <br />Term of Repayment: <br />30 years <br />Loan Contract No.: <br />C150222, dated August 22, 2006 <br />Loan Payment: <br />$26,057.93 <br />Payment Initiation Date *: <br />(�c'7�c �e_r Z cop <br />Maturity Date *: <br />Z oaf <br />* Payment Initiation Date and Maturity Date fields are filled in after the project has been <br />substantially completed. <br />1. FOR VALUE RECEIVED, the BORROWER promises to pay the Colorado Water Conservation <br />Board ( "CWCB "), the Principal Amount plus Interest for the Term of Repayment, pursuant to <br />the LOAN CONTRACT and this promissory note. <br />2. Principal and interest shall be payable in equal L <br />payable one year from Payment Initiation DA <br />project is substantially complete), and annu <br />charges, if any, then remaining unpaid s <br />Date. <br />3. Payments shall be made to the Colorado Water <br />Room 721, Denver, Colorado 80203. OA <br />'th the first payment due and <br />r CWCB determines that the <br />II principal, interest, and late <br />able on or before the Maturity <br />on Board at 1313 Sherman Street, <br />4. The CWCB may impose a late charge in theiount of 5% of the annual payment if the <br />CWCB does not receive the annual payment within 15 calendar days of the due date. <br />5. This Note may be prepaid in whole or in part at any time without premium or penalty. Any <br />partial prepayment shall not postpone the due date of any subsequent payments or change <br />the amount of such payments. <br />6. All payments received shall be applied first to late charges, if any, next to accrued interest and <br />then to reduce the principal amount. <br />7. This Note is issued pursuant to the LOAN CONTRACT between the CWCB and the BORROWER. <br />The LOAN CONTRACT creates security interests in favor of the CWCB to secure the prompt <br />payment of all amounts that may become due hereunder. Said security interests are <br />evidenced by a Security Agreement(s) and /or Assignment(s) ( "Security Instruments ") of even <br />date and amount and cover certain revenues, real property, water rights and /or accounts of <br />Appendix 2 to Loan Contract C150222 <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.