My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153723 PIF Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C153723 PIF Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2012 10:49:04 AM
Creation date
12/11/2012 10:33:47 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153723
Contractor Name
Orchard Mesa Irrigation District
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
HB 95-1155
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RESOLUTION OF <br />ORCHARD MESA IRRIGATION DISTRICT <br />The undersigned, being a majority of the directors of the Orchard Mesa Irrigation District <br />( "OMID ") at a special board meeting held October 29, 1996, at which a quorum of directors is <br />present, consent to, adopt and vote in favor of the following resolution: <br />RECITALS <br />A. OMID has determined that it will benefit landowners within its service area to <br />place the Mutual Mesa Lateral section of its delivery system, which is currently open ditch, in <br />closed pipe (referred to below as the "Mutual Mesa Project "). <br />B. By Resolution of this Board dated October 3, 1996, OMID formed the Mutual <br />Mesa Lateral Enterprise ( "MMLE "), a water activity enterprise as defined at C.R.S. §§ 37 -45.1- <br />101 et seq., to undertake the Mutual Mesa Project. <br />C. The Colorado Water Conservation Board (" WCB ") has agreed to loan MMLE a <br />portion of the funds, up to $871,800, necessary to and, Mutual Mesa Project, subject to <br />the terms and conditions of a Loan Contract & Pron so to byAld between the State of <br />Colorado, OMID, and MMLE (the "Loan Cont <br />this Resolution and incorporated here by referee <br />Loan Contract imposes certain duties and obligati <br />D. OMID and MMLE have agreed <br />will undertake the Mutual Mesa Project on OMI <br />, co, pf which is attached to <br />iWwill be loaned to OMID, the <br />and conditions under which MMLE <br />s behalf, and have reduced that understanding <br />to a written contract (the "Project Agreement "), an unsigned copy of which is attached to this <br />Resolution and incorporated here by reference. <br />E. After an open bid process, OMID has negotiated an agreement with Mendez <br />Construction to perform necessary construction on the Mutual Mesa Project (the "Contractor <br />Agreement "), a copy of which is attached to this Resolution and incorporated here by reference. <br />Because MMLE has agreed to undertake the Mutual Mesa Project and retain all contractors <br />necessary to construct the Mutual Mesa Project, OMID desires to assign all of its rights to enter <br />into and perform the Contractor Agreement to MMLE. <br />F. Pursuant to the Loan Contract, MMLE must establish a Certificate of Deposit <br />account in the amount of $50,370.02 and assign the Certificate of Deposit to the State of <br />Colorado. Pursuant to the Project Agreement, as additional compensation for the duties and <br />obligations undertaken by MMLE pursuant to that agreement, OMID is required to loan MMLE <br />the amount necessary to establish the required Certificate of Deposit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.