My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153723 PIF Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C153723 PIF Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2012 10:49:04 AM
Creation date
12/11/2012 10:33:47 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153723
Contractor Name
Orchard Mesa Irrigation District
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
HB 95-1155
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CRS 24 -30 -202 requires that the State Controller approve all state contracts. This contract is not <br />valid until the State Controller, or such assistant as he may delegate, has signed it. The <br />contractor is not authorized to begin performance until the contract is signed and dated below. If <br />performance begins prior to the date below, the State of Colorado may not be obligated to pay <br />for the goods and /or services provided. <br />STATE CONTROLLER: Leslie M. Shenefelt <br />By -- — ---_ <br />Effective • F <br />Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.