My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153495 PIF Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C153495 PIF Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2012 1:59:12 PM
Creation date
12/6/2012 1:50:25 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153495
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 89-85
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
is required, a description shall be given as to how this amount was <br />established. <br />An estimate of the required "Emergency Operating Fund" shall be developed for <br />this project based on the project's design. This fund is provided to finance <br />extraordinary costs beyond the scope of operation, maintenance and replacement <br />costs, such as repairing damage to project facilities resulting from floods, <br />windstorms, etc. The amount of the "Emergency Operating Fund" shall be <br />established from the guidelines supplied by the CWCB. <br />Task 9 - CHAPTER VII - Project Evaluation <br />Under project evaluation, the City's payment capacity shall be assessed based <br />on the revenues from sale of municipal and industrial water, which are <br />anticipated to be derived from the proposed project. Project evaluation shall <br />also contain a discussion of the ben a provided by the project including <br />municipal and industrial water,.,'a�itf igat'on. This shall include a <br />statement of the annual dollar, :ame t o e i. s to be obtained and the <br />source of or basis for such values.,•• <br />x <br />Task 10 - CHAPTER VIII - Financial Program <br />The financial program analysis shall include an allocation of project costs. <br />An explanation shall also be provided as to how the revenues shall be derived <br />to pay reimbursable project costs. A payout schedule shall be developed <br />showing each major item of income and expense, principal and interest payment <br />on construction fund for each year of the repayment period. <br />Task 11 - Prepare Final Report <br />Although the technical components of the feasibility study shall be covered in <br />Tasks 2 through 8, an essential element in the acceptability of the study <br />resultsis the incorporation of the work and work products into a comprehensive <br />final report for this project. The report shall be organized according to the <br />CWCB guidelines and shall contain a narrative discussion of the study process <br />and reasoning behind the formulation of alternatives, and the selection of the <br />preferred plan. Graphics will be used to the maximum extent in order to <br />enhance the readability and ease of understanding of the report. Summaries of <br />- 14 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.