F,— I- C -02A (R 5/85)
<br />W /PB
<br />EXHIBIT B
<br />FEASIBILITY REPORT
<br />CONTRACT
<br />DEPAR. �...,,� OR AGENCY NUMBER
<br />34 -04 -00
<br />CONTRACT ROt)1TING NUMBER
<br />�'7,16;q
<br />$22,683
<br />THIS CONTRACT, made this 1 S day of 198 :7 , by and between the
<br />State of Colorado for the use and benefit of the Department of ' Natural Resources
<br />(Colorado Water Conservation Board)
<br />hereinafter referred to as the State, and -2 the City of Greeley, Greeley Civic Center,
<br />919 7th St., Greelev, CO 80631
<br />hereinafter referred to as the ODntractor,
<br />WHEREAS, authority exists in the Law and Funds have been budgeted, appropriated and otherwise made
<br />available and a sufficient unencumbered balance thereof remains available or , payment in Fund Number 4 0 0 8
<br />GIL Account Number 5 2 8 6 7, Contract Encumbrance Number 1� j -? . , and
<br />ABL Account Dumber 12860, Org. Unit 77 -77 -777,
<br />WHEREAS, required approval, clearance and coordination has been accomplished from and with appropriate
<br />agencies; and
<br />WHEREAS, pursuant to the provisions of section 37 -60 -119,
<br />Colorado Revised Statutes, as amended, the State is authorized
<br />to construct certain water projects for the benefit of the
<br />people of the State of Colorado; and
<br />WHEREAS, the City of Greeley has made application to the
<br />State for the improvement of its existing facility, the Barnes
<br />Meadow Reservoir Dam, such improvement of the facility is
<br />hereinafter sometimes referred to as the project; and
<br />WHEREAS, the Contractor is a city within the State of
<br />Colorado;
<br />NOW THEREFORE, it is hereby agreed that:
<br />1. The Contractor shall hP easibility report prepared
<br />and directed to the problem o in t e facilities of the
<br />Barnes Meadow Reservoir Da c th a proposal for a
<br />project feasibility report a consulting
<br />engineering firm of Morrison nu ineers, Inc. (the
<br />Consultant), and approved by t e. received May 28. 1987,
<br />which proposal is attached s Exhibit A and made a part
<br />of this contract.
<br />2. Fifteen (15) copies of the final report called for in
<br />this contract shall be furnished to the State not later than
<br />October 31, 1987, unless such time is extended by mutual
<br />agreement of the parties hereto in writing.
<br />3. As compensation for the services of the Contractor, the
<br />State shall pay to the Contractor the sum of Twenty -Two
<br />Thousand Six Hundred Eighty -Three Dollars ($22,683) in the
<br />manner following:
<br />a. Sixty percent (60 %), to wit, Thirteen Thousand Six
<br />Hundred Nine Dollars and Eighty Cents ($13,609.80) of the
<br />total amount due in two (2) monthly installments of Six
<br />Thousand Eight Hundred Four Dollars and Ninety Cents
<br />($6,804.90) each, commencing on August 14, 1987.
<br />b. The remaining forty percent (40'x), to wit, Nine
<br />Thousand Seventy -Three Dollars and Twenty Cents ($9,073.20)
<br />within forty (40) days following receipt and acceptance of
<br />the written report specified in paragraph 2. of this
<br />contract.
<br />4. The total
<br />Contractor by the
<br />Hundred Sixty -Six
<br />pay the sum of Tw
<br />Dollars ($22,683)
<br />395-5301.1094
<br />cost of services to be rendered for the
<br />Consultant is Forty -Five Thousand Three
<br />Dollars ($45,366) and the Contractor shall
<br />enty -Two Thousand Six Hundred Eighty -Three
<br />as agreed to by letter dated May 21, 1987,
<br />Page I of 4 pages 3 7 5 3 E
<br />*(See instructions on reverse of last page.)
<br />EXHIBIT B
<br />
|