My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153495 PIF Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C153495 PIF Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2012 1:59:12 PM
Creation date
12/6/2012 1:50:25 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153495
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 89-85
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A complete hydraulic evaluation of the outlet works shall be performed under <br />this subtask. The analysis will be based on the visual inspection and review <br />of video tapes in Task 2 and will note any adverse hydraulic characteristics <br />within the intake, conduit, and discharge structure. The capacity and <br />operating requirements of the outlet works shall be examined and evaluated. A <br />discharge rating curve shall be prepared to reflect existing conditions. <br />Release and drawdown criteria shall be developed and checked. The results of <br />these evaluations shall be the basis for formulating alternative solutions for <br />comparison. The structural and general operation condition of the gates and <br />conduit shall be considered in the overall determination of the rehabilitation <br />requirements. <br />The elements of this task shall be closely coordinated with the activities in <br />Subtask 7.2, relating to geotechnical analysis and overall stability. <br />7.4 Miscellaneous Design Considerf' <br />7.4.1 Drainage <br />Present or anticipated drainage pro ms shall be evaluated and discussed with <br />the CWCB and the City. A project drainage plan will be developed if necessary. <br />7.4.2 Sedimentation <br />A sedimentation analysis shall be performed as part of the hydrologic work. <br />Estimated rates of sediment deposition shall be calculated. Sediment storage <br />requirements shall be determined and the effect on the reservoir outlet <br />assessed. The basic data and method used in sediment computations shall be <br />included. <br />7.4.3 Right -of -Way <br />The study shall include an evaluation of right -of -way requirements for the <br />project and the results shall be presented in the final report. <br />- 12 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.