Laserfiche WebLink
Barnes Meadow Dam <br />0PB <br />DEPARTMENT �ENCY NAME <br />Water Conse v, on Board <br />DEPARTMENT OR AGENCY NUMBER <br />PDA <br />II ROUTING NUMBER �0 <br />$98,424 <br />Total Contract Amount: $290,741 <br />AMENDMENT #1 TO PROJECT CONTRACT <br />THIS CONTRACT, made this _ / 4 day <br />use and benefit of the Department of <br />/qua <br />-}99-2; by and between the State of Colorado for the <br />(COLORADO WATER CONSERVATION BOARD) <br />hereinafter referred to as the State, and the City of Greeley, <br />1000 10th Street, Greeley, Colorado 80631 <br />hereinafter referred to as the contractor /Contractor or Borrower. <br />WHEREAS, authority exists in the Law and Funds have been budgeted, appropriated and otherwise made available and a sufficient <br />unencumbered balance thereof remains available for payment in Fund Number 424 , Organization YYYY . Appropriation 378 . <br />Program WTRC , Object Code 5120 , Contract Encumbrance Number, C- 153588; and <br />WHEREAS, required approval, clearance and coordination have been accomplished from and with appropriate agencies; and <br />WHEREAS, the State and the Contractor entered into a <br />contract dated April 8, 1991, Contract Encumbrance Number <br />C- 153588 (hereinafter called t " Contract "); and <br />WHEREAS, the scope of the identified in the Original <br />Contract was measurably increased d final design of the <br />project; and <br />WHEREAS, one of the co' i ns in the Original Contract was <br />that the project be completed within thirty (30) months of the <br />date of execution for said contract; and <br />WHEREAS, the increase in scope of the project and the <br />complexity of design for the project have caused the contractor <br />innumerable delays; and <br />WHEREAS, the increase in scope of the project has increased <br />the estimated cost of the project by over Two Hundred Thousand <br />Dollars ($200,000); and <br />WHEREAS, paragraph 2 of section 1 of Senate Bill No. 85 <br />(1989) authorized the Colorado Water Conservation Board to <br />increase the initial appropriation for this project "plus or <br />minus such amounts, if any, as may be justified by reason of <br />ordinary fluctuations in construction costs as indicated by the <br />Page 1 of 7 Pages <br />