My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153588 PIF Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C153588 PIF Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2013 8:58:02 AM
Creation date
12/6/2012 1:50:22 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153588
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 89-85
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT D <br />_ r <br />SCHEDULE A <br />COLORADO WATER CONSERVATION BOARD <br />CONSTRUCTION FUND PROGRAM PROCEDURES <br />1. Board approval of engineering firm and engineering <br />agreement between engineering firm and project sponsor. <br />2. Preparation of detailed plans and specifications for <br />authorized projects by consulting engineering firm. <br />3. Approval of detailed plans and specifications by Board <br />staff (plans and specifications for storage dams and <br />reservoirs must also be approved by State Engineer's <br />office) . <br />4. Board staff approval of bidding for the project. Board <br />staff present at bid opening for construction. <br />5. Project sponsor may issue the no a of award and the <br />notice to proceed with const to the contractor <br />(both notices must be appr�2 t B� staff before <br />they are issued). <br />6. Conduct a pre - construction'- c�or'ference. Approval of <br />construction schedule by Board staff. <br />7. Construction commences. The Board staff makes periodic <br />inspections during construction. All change orders must <br />be approved by the Board staff in advance and before any <br />construction on change items can commence. Emergency <br />items cleared by telephone. <br />S. The consulting engineer certifies that the project has <br />been completed according to approved drawings and <br />specifications and arranges for final inspection. <br />9. Final inspection and acceptance of as -built project by <br />Board staff. <br />10. Submittal of as -built drawings to Board staff for <br />approval and filing. <br />1588E <br />VVUTMTT n <br />
The URL can be used to link to this page
Your browser does not support the video tag.