My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153588 PIF Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C153588 PIF Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2013 8:58:02 AM
Creation date
12/6/2012 1:50:22 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153588
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 89-85
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a <br />Colorado Water Conservation Board <br />May 21, 1987 <br />Page 2 <br />submitted in response to your agency's letter dated June 17, 1986 <br />(relating to the three 1986 feasibility studies) would be required for <br />the Barnes Meadow Dam study. In an effort to accelerate the execution <br />of a contract between the City of Greeley and the CWCB, we have <br />prepared and have enclosed an updated legal opinion addressing the <br />items noted in your June 17, 1986 letter. The enclosed attorney's <br />opinion was rendered by Mr. William E. Bohlender, attorney for the <br />City of Greeley Water and Sewer Board. This legal opinion is based on <br />the assumptions that: a) the Contract for the Barnes Meadow Study will <br />be similar to the 1986 City of Greeley /CWCB Contract; and b) Mr. W.D. <br />Farr, Chairman of the City of Greeley Water and Sewer Board, will sign <br />the City of Greeley /CWCB Contract as he did in 1986. The legal <br />opinion is enclosed as Attachment B. Enclosed documents supporting <br />this legal opinion include: <br />Attachment B1 - Charter of the .. f Greeley <br />Attachment B2 - Excerpt fr s.P 1982 City Council Committee - <br />of- the -Whole meeting, re pointinf W.D. Farr to the City of <br />Greeley Water and Sewer Ran <br />Attachment B3 - Minutes e��anuary 8 , 1987 Greeley Water and <br />Sewer Board meeting indicating the election of Mr. W.D. Farr as <br />Chairman of the Greeley ;Dater and Sewer Board for 1987 <br />Attachment B4 - Minutes of the May 7, 1987 Greeley Water and <br />Sewer Board meeting indicating the Board's authorization to <br />employ MKE to perform the Barnes Meadow Dam Feasibility Study <br />As stated, the enclosed legal opinion is based on the assumption <br />that the Barnes Meadow Dam Study Contract will be similar to the 1986 <br />City of Greeley /CWCB Contract. Upon receipt of the proposed City of <br />Greeley /CWCB Contract from your agency, Mr. Bohlender will review the <br />Contract to determine the validity of this assumption, and will, at <br />that time, modify his legal opinion, if appropriate. If the Contract <br />is acceptable to Mr. Bohlender, it will be considered during the June <br />4, 1987 meeting of the Greeley Water and Sewer Board and, if <br />acceptable to the Board, will be approved and signed. Following <br />approval of the Contract by the Greeley Water and Sewer Board, the <br />signed Contract will be returned to your agency accompanied by: a) a <br />statement by Mr. Bohlender which verifies or modifies the legal <br />opinion enclosed herein; and b) minutes of the Greeley Water and Sewer <br />Board meeting in which the proposed CWCB Contract was approved. <br />We hope the submittal of the attached material will expedite the <br />execution of the Contract between the City of Greeley and the CWCB for <br />this engineering feasibility study. If furt;ier information is <br />
The URL can be used to link to this page
Your browser does not support the video tag.