Laserfiche WebLink
is required, a description shall be given as to how this amount was <br />established. <br />An estimate of the required "Emergency Operating Fund" shall be developed for <br />this project based on the project's design. This fund is provided to finance <br />extraordinary costs beyond the scope of operation, maintenance and replacement <br />costs, such as repairing damage to project facilities resulting from floods, <br />windstorms, etc. The amount of the "Emergency Operating Fund" shall be <br />established from the guidelines supplied by the CWCB. <br />Task 9 - CHAPTER VII - Project Evaluation <br />Under project evaluation, the City's payment capacity shall <br />on the revenues from sale of municipal and industrial <br />anticipated to be derived from the proposed project. Projec <br />also contain a discussion of the benefits provided by the <br />municipal and industrial water, and irrigation. This <br />statement of the annual dollar amount of benefits to be <br />source of or basis for such values. <br />Task 10 - CHAPTER VIII - Financaram <br />be assessed based <br />water, which are <br />t evaluation shall <br />project including <br />shall include a <br />obtained and the <br />The financial program any include an allocation of project costs. <br />An explanation shall also be pro-; to how the revenues shall be derived <br />S <br />to pay reimbursable ' tos yout schedule shall be developed <br />showing each major i tom. i nc me �' and expense, principal and interest payment <br />on construction fund for each year of the repayment period. <br />Task 11 - Prepare Final Report <br />Although the technical components of the feasibility study shall be covered in <br />Tasks 2 through 8, an essential element in the acceptability of the study <br />resultiis the incorporation of the work and work products into a comprehensive <br />final report for this project. The report shall be organized according to the <br />CWCB guidelines and shall contain a narrative discussion of the study process <br />and reasoning behind the formulation of alternatives, and the selection of the <br />preferred plan. Graphics will be used to the maximum extent in order to <br />enhance the readability and ease of understanding of the report. Summaries of <br />- 14 - <br />