My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153588 PIF Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C153588 PIF Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2013 8:58:02 AM
Creation date
12/6/2012 1:50:22 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153588
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 89-85
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
t <br />State not less than fifteen (15) days prior to the <br />beginning of such month. <br />b. Upon receipt and approval by the State of such <br />monthly estimate, the State will, within forty (40) <br />days from the approval of such estimate, pay over to <br />the Contractor the amount of the monthly estimate or <br />such portion thereof as has been approved by the State. <br />C. Project construction costs eligible for payment by <br />the State shall be limited to the cost of: <br />(1) Preparing final designs and specifications <br />for the project. <br />(2) Preparing bid and construction contract <br />documents. <br />(3) Preparing environmental assessment or <br />environmental impact statements, and otherwise <br />complying with the federal National Environmental <br />Policy Act. <br />(4) Complying with al er tate, and local <br />regulatory requiremen Fecessary the obtaining <br />of all required permi <br />(5) Land and wate ht tions needed for <br />the project, includ t appraisals <br />and evaluations. Aj <br />(6) Fish and wildlif -tiyr tigation measures <br />required by federal, State, or local laws and <br />regulations. <br />(7) Actual construction as called for in the bid <br />documents and in Change Orders approved by the <br />Consultant, the Contractor, the Construction Firm, <br />and the State. <br />(8) Engineering services for construction <br />management, including design and construction <br />management for State - approved Change Orders. <br />(9) Legal services for: <br />(a) Reviewing engineering services contracts. <br />(b) Reviewing this contract. <br />(c) Reviewing construction contract <br />documents. <br />(d) Acquiring the land and water rights <br />needed for the project. <br />(e) Complying with all federal State, and <br />local regulatory requirements. <br />Legal services must be approved by the State <br />in writing before they are rendered to be <br />eligible for payment by the State. <br />2. Provide the Contractor with such technical assistance <br />as the State deems appropriate in planning, constructing, and <br />operating the project and in coordinating the project with <br />local official comprehensive plans for sewer and water and with <br />any State or area plans for the area in which the project is <br />located. <br />Page 6 of 10 Pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.