My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153588 PIF Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C153588 PIF Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2013 8:58:02 AM
Creation date
12/6/2012 1:50:22 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153588
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 89-85
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Barnes Meadow Dam <br />WPB <br />r— <br />DEPARTMENT <br />- <br />'ENCY NAME <br />Water Conser: <br />an Board <br />DEPARTMENT OR <br />AGENCY NUMBER <br />PDA <br />ROUTING NUMBER <br />Ir <br />7t� <br />a7ti, 4L4 <br />Total Contract Amount: $290,741 <br />AMENDMENT #1 TO PROJECT CONTRACT <br />THIS CONTRACT, made this _ 14— day <br />use and benefit of the Department of <br />hereinafter referred to as the State, and <br />Q cl 3 <br />i, by and between the State of Colorado for the <br />hereinafter referred to as the contractor /Contractor or Borrower. k- O /,y�+ <br />"O <br />WHEREAS, authority exists in the Law and Funds have been budgeted, appropriated and otherwise made available and a sufficient <br />unencumbered balance thereof remains available for payment in Fund Number. 414 . Organization YYYY . Appropriation 378 . <br />Program _WTRC . Object Code 5120 . Contract Encumbrance Number, C- 153588: and <br />WHEREAS, required approval, clearance and coordination have been accomplished from and with appropriate agencies; and <br />WHEREAS, the State and the Contractor entered into a <br />contract dated April 8, 1991, Contract Encumbrance Number <br />C- 153588 (hereinafter called t tt Contract "); and <br />WHEREAS, the scope of the i entified in the Original <br />Contract was measurably increased d final design of the <br />project; and fVIAL <br />W <br />IN HEREAS, one of the colr=10 ns in the Original Contract was <br />that the project be completed within thirty (30) months of the <br />date of execution for said contract; and <br />WHEREAS, the increase in scope of the project and the <br />complexity of design for the project have caused the contractor <br />innumerable delays; and <br />WHEREAS, the increase in scope of the project has increased <br />the estimated cost of the project by over Two Hundred Thousand <br />Dollars ($200,000); and <br />WHEREAS, paragraph 2 of section 1 of Senate Bill No. 85 <br />(1989) authorized the Colorado Water Conservation Board to <br />increase the initial appropriation for this project "plus or <br />minus such amounts, if any, as may be justified by reason of <br />ordinary fluctuations in construction costs as indicated by the <br />Page 1 of 7 Pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.