My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153633A PIF Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C153633A PIF Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2013 12:01:22 PM
Creation date
12/6/2012 1:50:17 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153633A
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
HB 91-1006
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENCY NAME Water Conservation Board <br />AGENCY NUMBER PDA <br />ROUTING NUMBER G 0,26 4? <br />CONTRACT AMENDMENT #1 <br />THIS AMENDMENT, made this day of 1995, by and between the State of Colorado <br />for the use and benefit of the Departme t of Natural Resources, Colorado Water Conservation Board (CWCB), <br />hereinafter referred to as the STATE, and the CITY OF GREELEY, Greeley Civic Center, Greeley, Colorado 80631, <br />hereinafter referred to as the CONTRACTOR. <br />RECITALS <br />1. Authority exists in the law, and funds have been budgeted, appropriated, and otherwise made available and <br />a sufficient unencumbered balance thereof remains available for payment in Fund Number 424, Appropriation Code <br />362, Contract Encumbrance Number C153633; and <br />2. Required approval, clearance, and coordination has been accomplished from and with appropriate agencies; <br />and <br />3. The STATE and the CONTRACTOR entered into a contract dated November 19, 1992, Contract Routing Number <br />93314, Contract Encumbrance Number C153633, hereinafter referred to as ORIGINAL CONTRACT, wherein the STATE <br />agreed to loan money in the total amount of $250,000 ($230,000 for project construction and $20,000 for feasibility <br />report contract) to the CONTRACTOR to be used for enlargement and rehabilitation of Hourglass Dam and the CONTRACTOR <br />agreed to repay the loan in accordance with the terms of the ORIGINAL CONTRACT; and <br />4. Paragraph A.2 of the ORIGINAL CONTRACT states that the completion date of the PROJECT is to be within two <br />and one -half (2 1 /2) years from the date of the ORIGINAL CONTRACT unless extended by the STATE due to circumstances <br />beyond the control of the CONTRACTOR; and <br />5. CONTRACTOR has supplied a letter dated March 71 199 eto as ATTACHMENT A and made a <br />0. part hereof, requesting an extension for the date of completion, e d and reason for the extension; <br />and <br />6. The STATE has reviewed the situation and is satisfie th S TOR'S need for an extension of one <br />and one -half (1 1/2) years is reasonable and necessary; and <br />7. The STATE and the CONTRACTOR agree to extend the time for completion of the ORIGINAL CONTRACT by one <br />and one -half (1 1/2) years to November 19, 1996. <br />NOW THEREFORE, it is hereby agreed that <br />1. Consideration for this Amendment to the ORIGINAL CONTRACT consists of the payments which shall be made <br />pursuant to this Amendment and ORIGINAL CONTRACT and the promises and agreements herein set forth. <br />2. It is expressly agreed by the parties that this Amendment is supplemental to the ORIGINAL CONTRACT which <br />is made a part hereof, and identified as ATTACHMENT B and all terms, conditions, and provisions thereof, unless <br />specifically modified herein, are to apply to this Amendment as though they were expressly rewritten, incorporated, <br />and included herein. <br />3. It is agreed the ORIGINAL CONTRACT is and shall be modified, altered, and changed to read as follows: <br />a. Paragraph B.2: Contract for the construction of said PROJECT to responsible and capable firms, hereinafter <br />referred to as CONSTRUCTION FIRMS, which CONSTRUCTION FIRMS shall be selected through competitive public <br />bidding, said PROJECT to be completed within four (4) years of the date of this contract (by November 19, <br />CITY OF GREELEY Page 1 of 2 CONTRACT AMENDMENT #1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.