My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
StCharlesMesa_MeterRplcmntPhase2_FinalReport
CWCB
>
Water Efficiency Grants
>
Day Forward
>
StCharlesMesa_MeterRplcmntPhase2_FinalReport
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2012 4:12:09 PM
Creation date
12/4/2012 2:54:16 PM
Metadata
Fields
Template:
Water Efficiency Grants
Water Efficiency Grant Type
Water Conservation Implementation Grant
Contract/PO #
OE PDA 13-31
Applicant
St Charles Mesa Water District
Project Name
Meter Replacement Program Phase 2
Title
Final Report
Date
11/16/2012
County
Pueblo
Water Efficiency - Doc Type
Final Report
Document Relationships
StCharlesMesa_MeterRplcmntPhase2_50%PR
(Message)
Path:
\Water Efficiency Grants\Day Forward
StCharlesMesa_MeterRplcmntPhase2_75%PR
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
StCharlesMesa_MeterRplcmntPhase2_Applic
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
StCharlesMesa_MeterRplcmntPhase2_ApprvlLtr
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
StCharlesMesa_MeterRplcmntPhase2_Invoice
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
StCharlesMesa_MeterRplcmntPhase2_PO
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Success of meeting previously <br />The meter installations have been <br />identified goals and objectives <br />completed ahead of schedule. <br />Had some trouble getting the meter <br />lids in a timely manner from the <br />Obstacles Encountered <br />supplier. <br />The installation crew installed <br />Preliminary findings or <br />almost 100 new meters in one day, <br />Accomplishments <br />on November 14, 2012 <br />Potential need for revision to the <br />The installations in the core area <br />scope of work and timeline I <br />seem to proceed much faster. <br />As of November 16, 2012, the goals and objectives of this project have been met. Most of the <br />existing meter pits were in relatively good condition, and the final portion of the project proceeded <br />at a very high rate of production. On November 14, 2012, the crews installed almost 100 new <br />meters in a single day. <br />A copy of the timeline is also attached. <br />The total area in the first half of the 2012 Meter Replacement Project was 1.2 square miles. <br />Kenneth Alan Young, oloral Registered Professional Engineer # 33405 Date <br />