Laserfiche WebLink
At its January 2011 meeting, the CWCB approved a Small Project Loan from the <br />Construction Fund to the BORROWER in an amount up to $2,845,350 for PROJECT Costs, <br />not to exceed 90% of the cost of the PROJECT, with a loan origination fee of 1% in <br />accordance with CWCB Policy No. 16, at an interest rate of 4.75% per annum for a <br />repayment term of 20 years. <br />SECTION 5 — SCHEDULE OF EXISTING DEBT <br />No existing debt pledged with the District's enterprise revenues. <br />SECTION 6 — ADDITIONAL CONDITIONS & CONTRACT REQUIREMENTS <br />No additional contract requirements. <br />SECTION 7 — CONSTRUCTION FUND PROGRAM PROCEDURES <br />A. The BORROWER shall employ an engineer, registered in the state of Colorado to <br />prepare plans and specifications for the PROJECT. <br />B. The BORROWER's and the Engineering sultant's plans and specifications must <br />be submitted to the CWCB staff for ve ' n o liance with the terms of this <br />Contract when available prior to bi ifications to the plans and <br />specifications must be approved in by CB staff. <br />C. For plans and specifications for isd' dams and reservoirs, as defined <br />by § 37 -87 -105 C.R.S., the BORRO ER &S rovide a letter of approval from the <br />State Engineer's Office prior to constr <br />D. CWCB staff must be present at bid ing and must approve the award of the <br />construction contract. <br />E. The BORROWER shall contract for the construction of the work with responsible and <br />capable Construction Firms, which said Construction Firms shall be selected by <br />the BORROWER and found acceptable by the CWCB staff. <br />F. The BORROWER must provide a copy of the executed construction contract <br />documents consisting of the contractor's proposal, construction contract, <br />performance bond, payment bond, notice of award, notice to proceed, sample <br />change order, and sample field order, as well as the advertisement for bid and bid <br />bond at bidding. After the CWCB staff verifies that these documents comply with <br />the terms of this contract, the BORROWER may issue the notice to proceed to the <br />Construction Firms. <br />G. The BORROWER shall conduct a pre- construction conference at which time the <br />CWCB staff shall have the opportunity to review and approve the construction <br />schedule. <br />H. If the CWCB staff determines that the PROJECT requires a resident inspector during <br />construction, the BORROWER shall employ an inspector who has been approved by <br />the CWCB staff. <br />Appendix 1 to Loan Contract C150315 <br />Page 2 of 4 <br />