My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150090 PIF Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150090 PIF Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2012 9:37:16 AM
Creation date
11/8/2012 9:25:30 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150090
Contractor Name
Parker Water and Sanitation District
Contract Type
Loan
Water District
8
County
Douglas
Bill Number
HB 02-1152
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT SUMMARY — PARKER WATER & SAN DISTRICT <br />CONTRACT No. C150090 <br />SECTION 1 — BORROWER INFORMATION <br />Name: Parker Water and Sanitation District, acting by and <br />through its Water Activity Enterprise and its Sanitary <br />Sewer Activity Enterprise <br />Address: 19801 E. Mainstreet <br />Parker, CO 80138 <br />Phone Number: 303- 841 -4627 <br />Contact: Frank Jaeger, District Manager <br />Type of Entity: Parker Water and Sanitation District is a Special <br />District formed pursuant to Title 32 that provides <br />water and sanitary sewer service to customers within <br />its service arauL The BORROWER is /constitutes two <br />enterprise m n of § 37 -45.1 -101 et seq., <br />C.R.S. d I Section 20 (2)(d) of the <br />Colora tit September 9, 1993, the Board <br />of Directo of er Water and Sanitation District, <br />created t aXrr activity enterprise pursuant to <br />Resoluti 1993 -10 and the sewer activity enterprise <br />pursuant t Resolution No. 1993 -11, which are <br />incorporated herein by reference. <br />Section 2 — Project Description <br />A. Description of PROJECT: The BORROWER applied to the CWCB for a loan to be <br />used for the construction of the Rueter -Hess Reservoir Project, located in <br />Douglas County, hereinafter referred to as the PROJECT, at an estimated total <br />cost of $103,000,000. <br />B. Description of Feasibility Study: The CWCB has reviewed a feasibility <br />study report on the PROJECT compiled by Robert J. Huzjak, P.E. of GEI <br />Consultants, which is incorporated herein by reference, and, based upon <br />the feasibility report, the CWCB determined the PROJECT to be technically <br />and financially feasible. <br />SECTION 3 — CWCB'S AUTHORITY <br />This loan is made pursuant to the provisions of §§ 39- 29- 109(1)(a)(1), 37 -60- <br />119 and 37 -60 -120, C.R.S., the CWCB is authorized to loan money for water <br />projects from the CWCB Severance Tax Trust Fund Perpetual Base Account <br />for the benefit of the people of the STATE, provided that the borrower assures <br />repayment of that money. <br />Appendix 1 to Loan Contract C150090 <br />
The URL can be used to link to this page
Your browser does not support the video tag.