Laserfiche WebLink
CWCB Water Project Loan Application <br />4. Please provide a brief description of the owner's existing water supply facilities and describe <br />any existing operational or maintenance problems. Attach a m�C ff ap of the service area <br />' ct u ome) ` o:Zn <br />/act 1 v� <br />or Number of customers served 1 l we-it ton <br />ILI, L6 lQl� <br />U se. <br />Water Right: CFS. <br />acre -feet. <br />V3 RME; � ' ;rte <br />2. Pkirpo e of this loan application. Check one. <br />New project <br />Rehabilitation or replacement of existing facility <br />Enlargement of existing facility <br />Emergency Repair <br />Other (describe) <br />3. if the project is for rehabilitation of an existing reservoir, is the reservoir currently under a <br />storage restriction order from the State Engineer? YES L1 NO ® � JP, <br />4. General location of the project. (Please include county, and approximate distance and direction <br />from nearest town, as well as legal descriptio if known. <br />5. Please provide a brief narrative description of the proposed project including purpose, need, <br />facilities, type of water us 5s to be served and service area. Attach separate heet, if Peed <br />e• <br />b. Will the acquisition of additional water rights be necessary? YES NO <br />If YES, please explain. 174 *m n-e !e5Saru'or WAS 40 Se.Lure <br />CC_ <br />rya <br />reQ laeerr;en+ needs, -5o a ~fir }7t,t.Yh P i e an be. <br />m%u-cd 4D Con4ao� ho[JaS ease.. '5". �. <br />For existing facilities indicate: <br />A1r <br />Number of shareholders <br />e9QQ' p <br />Current Assessment per share $ <br />Number of acres irrigated <br />A�t= For <br />Average water diverted per year: <br />k013- e(It Part B. - Description of the Project <br />g wyll M 1. Name of the PrcjectgiffJaV- r <br />' ct u ome) ` o:Zn <br />/act 1 v� <br />or Number of customers served 1 l we-it ton <br />ILI, L6 lQl� <br />U se. <br />Water Right: CFS. <br />acre -feet. <br />V3 RME; � ' ;rte <br />2. Pkirpo e of this loan application. Check one. <br />New project <br />Rehabilitation or replacement of existing facility <br />Enlargement of existing facility <br />Emergency Repair <br />Other (describe) <br />3. if the project is for rehabilitation of an existing reservoir, is the reservoir currently under a <br />storage restriction order from the State Engineer? YES L1 NO ® � JP, <br />4. General location of the project. (Please include county, and approximate distance and direction <br />from nearest town, as well as legal descriptio if known. <br />5. Please provide a brief narrative description of the proposed project including purpose, need, <br />facilities, type of water us 5s to be served and service area. Attach separate heet, if Peed <br />e• <br />b. Will the acquisition of additional water rights be necessary? YES NO <br />If YES, please explain. 174 *m n-e !e5Saru'or WAS 40 Se.Lure <br />CC_ <br />rya <br />reQ laeerr;en+ needs, -5o a ~fir }7t,t.Yh P i e an be. <br />m%u-cd 4D Con4ao� ho[JaS ease.. '5". �. <br />