My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150340 Feasibility
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150340 Feasibility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2016 9:13:17 AM
Creation date
10/10/2012 10:07:14 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-056
C150340
Contractor Name
Ridgway, Town of
Contract Type
Loan
Water District
68
County
Ouray
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Collateral <br />The Town will pledge the project itself and water fund revenues. <br />Economic. Analysis <br />In renovating the municipal reservoir, the Town will be able to efficiently store and utilitize the <br />store water, which is currently not the case. In conjunction with the restoration, expanding the <br />storage capacity of the reservoir will regain at least 360 acre feet of functional storage of pre - <br />1922 water rights, which is desperately needed as the Town's most senior in- stream water <br />rights were out of priority in 2002 and may likely be called again in 2012 due to the existing <br />drought. The cost per acre foot of stored water is less than $6000. The storage of pre -1922 <br />water will not only assist the Town today but will augment supply for absorbing growth in the <br />future and will also assist the State of Colorado if there is a Colorado River Compact call. The <br />Town is in great need of a secure and reliable municipal water source for current and future <br />growth, which will benefit the Town and Ouray County. <br />Social and Physical Impacts <br />The project will have no significant social or physical negative impacts. It will however have a <br />postive social impact by greatly improving the reliability of the Town's water supply. <br />Conclusions <br />The Town is a municipal corporation incorporated in the State of Colorado with the ability to <br />enter into a contract with the CWCB for the purpose of obtaining a Construction Fund Loan. <br />The Town has the resources to manage all aspects of the Project. <br />The project will provide much needed storage of water for the beneficial use of the Town's <br />current and future residents and businesses. <br />Expanding the Lake will not only assist the Town when the Town's water rights are out of <br />priority but will also assist the State by storage of water with a pre -1922 decree. <br />The Town is working to secure all the reasonable financial assistance needed to construct the <br />project. <br />The project is technically and financially feasible. <br />
The URL can be used to link to this page
Your browser does not support the video tag.