Laserfiche WebLink
CWCB Water Project Loan Application <br />4. Please provide a brief description of the owner's existing water supply facilities and describe <br />any existing operational or maintenance problems. Attach a map of the service area <br />The Town has water riqhts in Beaver Creek and Cottonwood Creek. The Town also owns Lake Otonowanda. <br />In dry years the Town's water right can be out of priority. To provide a reliable water supply in dry years <br />the town is proposing to rehabilitate and expand Lake O. so it can provide a reliable water supply during a call. <br />For existing facilities indicate: <br />Number of shareholders <br />Current Assessment per share $ <br />Number of acres irrigated <br />or Number of customers served -1000 <br />Number of shares <br />Water Right: 2 +* CFS. <br />Average water diverted per year: —280 acre -feet. <br />Part B. - Description of the Project <br />1. Name of the Project Lake Otonowanda <br />2. Purpose of this loan application. Check one. <br />New project <br />Rehabilitation or replacement of existing facility <br />Enlargement of existing facility <br />Emergency Repair <br />Other (describe) project includes both rehab and enlargement <br />I If the project is for rehabilitation of an existing reservoir, is the reservoir currently under a <br />storage restriction order from the State Engineer? YES 0 NO I] <br />4. General location of the project. (Please include county, and approximate distance and direction <br />from nearest town, as well as legal description, if known. <br />In Ouray County, in the NW4 of Section 32, 45N, 8R, NMPM about 3 miles south of Ridgway off CR 5 <br />5. Please provide a brief narrative description of the proposed project including purpose, need, <br />facilities, type of water uses to be served and service area. Attach separate sheet, if needed. <br />See Attachment 3 <br />6. Will the acquisition of additional water rights be necessary? YES -0 NO <br />If YES, please explain. <br />2 <br />