My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150341 Feasibility
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150341 Feasibility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2015 4:19:18 PM
Creation date
10/10/2012 8:36:31 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-027
C150341
Contractor Name
Pisgah Reservoir and Ditch Company
Contract Type
Loan
Water District
12
County
Teller
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-4- November 1, 2011 <br />surfaces were jagged but sound and no fractured or loose rock was observed. The tunnel <br />discharges directly into the stream channel below the dam, which has a rock bottom and no <br />indications of past erosion. <br />Section 4 Photographs <br />4.1 Intake Structure <br />View of trashrack looking upstream from the upstream slope. <br />
The URL can be used to link to this page
Your browser does not support the video tag.