My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150341 Feasibility
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150341 Feasibility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2015 4:19:18 PM
Creation date
10/10/2012 8:36:31 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-027
C150341
Contractor Name
Pisgah Reservoir and Ditch Company
Contract Type
Loan
Water District
12
County
Teller
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ENGINEER'S INSPECTION REPORT <br />DAM NAME: MOUNT PISGAH <br />DATE. 6/28/2011 <br />DAM I.D.: 120129 <br />EXISTING INSTRUMENTATION FOUND F](110) NONE (111) GAGE ROD 0(112) PIEZOMETERS (113) SEEPAGE 'HEIRS / FLUMES <br />F-j (114) SURVEY MONUMENTS ❑ (115)OTHER <br />MONITORING OF INSTRUMENTATION E] (116) NO (117) YES PERIODIC INSPECTIONS BY. (118) OWNER E] (119) ENGINEER <br />Strongly recommend that the owner /caretaker perform routine visual inspections and fill out a resort. I have enclosed a blank report for you <br />CONDITIONS OBSERVED: Good ! X Acceptable f- Poor <br />PROBLEMS NOTED [:](630 NONE [] (61) ACCESS ROAD NEEDS MAINTENANCE El (62) CATTLE DAMAGE <br />E,/)(63) BRUSH ON UPSTREAtk1 SLOPE, CREST, CO: NSTREAM SLOPE. TOE [J(64) TREES ON UPSTREAM SLOPE. CREST, DOWNSTREAM SLOPE. TOE <br />r](65) RODENT ACTIVITY ON UPSTREAM SLOPE. CREST, 0OWNSTREAM SLOPE. TOE [�(66) DETERIORATED CONCRETE - FACING. OUTLET SPILLWAY <br />(67) GATE AND OPERATING MECHANISM NEED MAINTENANCE 0 (68) OTHER <br />- Clear willows/brush from spillway return channel along the downtream toe of dam in order to maximize channel flow capacity. <br />- Control vegetation on upstream slope of dam as needed. <br />- Control burrowina rodents on downstream slope as needed. <br />Perform monthly routine inspections and read seepage weir. Reset seepage weir & install staff rise Repair leak in diversion pipe so <br />seepage can be monitored better. <br />- Clear brush from both right and left or -ins. <br />CONDITIONS OBSERVED: C Good X] Acceptable ?, Poor <br />Go to next page for Overall Conditions and Items Requiring Actions <br />Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.