Laserfiche WebLink
SCHEDULE A <br />COLORADO WATER CONSERVATION BOARD <br />CONSTRUCTION FUND PROGRAM PROCEDURES <br />1. Board approval of engineering firm and engineering <br />agreement between engineering firm and project sponsor. <br />2. Preparation of detailed plans and specifications for <br />authorized projects by consulting engineering firm. <br />3. Approval of detailed plans and specifications by Board <br />staff (plans and specifications for storage dams and <br />reservoirs must also be approved by State Engineer's <br />office). <br />4. Board staff approval of bidding for the project. Board <br />staff present at bid opening for construction. <br />5. Project sponsor may issue the notice of award and the <br />notice to proceed with construction to the contractor <br />(both notices must be approved by the Board staff before <br />they are issued) . <br />6. Conduct a pre- construction conference. Approval of <br />construction schedule by Board staff. <br />7. Construction commences. The Board staff makes periodic <br />inspections during construction. All change orders must <br />be approved by the Board staff in advance and before any <br />construction on change items can commence. Emergency <br />items cleared by telephone. <br />8. The consulting engineer certifies that the roiect has <br />been completed according to approved drawi an <br />4 <br />specifications and arranges for final inspe;�or� r:, <br />9. Final inspection and acceptance of as -b pi;A by <br />Board staff. <br />10. Submittal of as -built drawings to Board staff f r <br />approval and filing. <br />k :' <br />3 <br />d102 <br />cwcb /coin/ f. un <br />