My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Criteria for Coordinated Long-Range Operation of Colorado River Reservoirs Pursuant to the Colorado River Basin Project Act of September 30 1968
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Criteria for Coordinated Long-Range Operation of Colorado River Reservoirs Pursuant to the Colorado River Basin Project Act of September 30 1968
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2012 3:41:59 PM
Creation date
8/14/2012 3:39:27 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Criteria for Coordinated Long-Range Operation of Colorado River Reservoirs Pursuant to the Colorado River Basin Project Act of September 30 1968
State
CO
Basin
Colorado Mainstem
Date
9/30/1968
Title
Criteria for Coordinated Long-Range Operation of Colorado River Reservoirs Pursuant to the Colorado River Basin Project Act of September 30 1968
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
717? <br />(2) The plan of operation shall include such detailed rules and <br />quantities as may be necessary and consistent with the criteria <br />contained herein, and shall reflect appropriate consideration of <br />the uses of the reservoirs for all purposes, including flood <br />control, river regulation, beneficial consumptive uses, power <br />production, water quality control, recreation, enhancement of <br />fish and wildlife, and other environmental factors. The projected <br />plan of operation may be revised to reflect the current hydrologic <br />conditions, and the Congress and the Governors of the Colorado <br />River Basin States shall be advised of any changes by June of each <br />year. <br />11. OPERATION OF UPPER BASIN RESERVOIRS <br />(1) The annual plan of operation shall include a determination <br />by the Secretary of the quantity of water considered necessary as <br />of September 30 of that year to be in storage as required by <br />Section 602(x) of P.L. 90 -537 (hereinafter "602(a) Storage "). <br />The quantity of 602(x) Storage shall be determined by the Secretary <br />after consideration of all applicable laws and relevant factors, <br />including, but not limited to, the following: <br />(a) Historic streamflows; <br />(b) The most critical period of record; <br />(c) Probabilities of water supply; <br />(d) Estimated future depletions in the upper basin, including the <br />effects of recurrence of critical periods of water supply; <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.