My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Basin Roundtable Technical Meeting #4 September 7 2004
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Basin Roundtable Technical Meeting #4 September 7 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2013 10:38:04 AM
Creation date
8/14/2012 3:39:20 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Basin Roundtable Technical Meeting #4 September 7 2004
State
CO
Date
9/27/2004
Title
Basin Roundtable Technical Meeting #4 September 7 2004
Water Supply Pro - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Final Gap Analysis <br />Arkansas Sub- basins <br />r Arkansas River Basin j <br />1 <br />park <br />CUaRce� __ li<Y0Y".% FJ Paso _s- Llnc I <br />v — K� <br />D <br />P - I 6en1 I Pmwers <br />rR <br />Haerra <br />UPPer Arkansas - 1 <br />Soulhweslern Arkansas Las Animas Daca <br />Urban Counties _ <br />Lower AWansas <br />Eastern Plains <br />Municipal and Industrial Gaps Final Gap Analysis <br />Final Gap Analysis: <br />Fsfimated <br />2000 <br />Remaining Gap, <br />Total <br />Basin <br />AFY in 2030 <br />Locationsof Gap <br />Arkansas <br />17500 <br />Upper and Southwestern regions (augmentation credits) and and Lower <br />Gross <br />Gross <br />region and unincorporated 0 Paso County (fine water supply) <br />Colorado <br />3,200 <br />Garfield. Grand and Summit Counties <br />DolareseSan <br />4,900 <br />San Miguel (water supply), Dolores (need for augmentation credits) and <br />.Hard San Miguel <br />SSI <br />San Joan (infrastructure to deliver existing and futurewater supprre ) <br />Gunnison <br />Z40D <br />Crested Butie Mountain Resort Upper Gunnison and OWay County <br />Gross <br />tlemarM <br />(need for augmentation credits) and other unincorporated areas not <br />I)s—. <br />(AF) <br />Demand <br />IAF) <br />served by Water Dishicls <br />North Platte <br />0 <br />No gap anticipated, but storage required for drought reliability <br />Rio Grande <br />000 <br />Physical availability of groundwater, but will need augmentation credits <br />22,700 <br />for.. Pumping <br />S;;th Mile <br />41,800 <br />All a- <br />YampafM,d <br />0 <br />Concerns over drought reliability due to transit losses. Oil shale <br />Green <br />58.500 <br />development in White {liver basin could silmihwntiy increase demands. <br />Total <br />69.800 <br />67,300 <br />292,800 <br />Final Gap Analysis <br />Final Gap Analysis: <br />Arkansas Basin <br />2000 <br />2000 <br />Total <br />Projected <br />nu <br />2030 <br />Total <br />Increase <br />Gross <br />Gross <br />2060 <br />C °raervehon <br />Gross <br />Gross <br />20]0 <br />'^ Gross <br />Subbasin <br />M &I <br />SSI <br />Grass <br />Sart °� <br />M &I <br />S51 <br />Gross <br />tlemarM <br />I)s—. <br />(AF) <br />Demand <br />IAF) <br />Demand <br />(AF) <br />(AF) <br />Demand <br />(AF) <br />Demand <br />(AF) <br />Demand <br />(AF) <br />IAFI <br />Upper <br />Arkansas <br />22,700 <br />22.700 <br />2.400 <br />36.400 <br />36,400 <br />13,700 <br />Urban <br />154,400 <br />58.500 <br />212,900 <br />14.500 <br />225,500 <br />67,300 <br />292,800 <br />79.900 <br />Counter <br />Lo.�er <br />Arkansas <br />12,200 <br />- <br />12.200 <br />900 <br />13,000 <br />13,000 <br />800 <br />Easra Plains <br />4,300 <br />4.300 <br />300 <br />5.500 <br />5,500 <br />1,200 <br />Swlirweslem <br />4,600 <br />- <br />4,800 <br />Son <br />7,200 <br />7.200 <br />2.400 <br />Arkansas <br />TOTAL <br />198,400 <br />58,600 <br />256,900 <br />18,600 <br />287,600 <br />67,300 <br />1 354,900 <br />98,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.