Laserfiche WebLink
t <br />2 <br />explanation of how the plan addresses a situation that affects "public health or safety" must be <br />included. <br />2. Show Proof of Notice as required in Section 37- 92- 308(3)(b)(Il) or 37- 92- 308(5)(a)(Il), <br />C.R.S., by providing a copy of a certificate of mailing or equivalent by first -class mail from the <br />applicant or electronic mail from the applicant. Those plans submitted under Section 37-92 - <br />308(4)(a)(I) must show Proof of Notice to all parties who have filed a statement of opposition <br />to the plan in water court, or, if the deadline for filing a statement of opposition has not passed, <br />the applicant may provide written notice of the request for approval of the substitute water <br />supply plan to all parties who have subscribed to the substitute water supply plan notification <br />list. <br />3. A narrative description shall be submitted summarizing the water resource aspects of the <br />proposed or existing operation including water usage and consumption and a proposed plan for <br />replacing out -of- priority depletions or for change of water right. <br />DEPLETION <br />4. Evaporation: Gross evaporation (free water surface) shall be calculated based upon <br />evaporation atlases in NOAA Technical Report NWS 33 or more site - specific information if <br />available. Any other estimate should be within 10% of the NOAA estimate. Any credits to <br />offset gross evaporation must be pursuant to state statutes and' state engineering policy. The <br />total gross evaporation estimate from NOAA 33 shall be distributed to all months. The -monthly <br />distribution for elevations below 6500 feet msl is: Jan -3.0 %, Feb -3.5 %, Mar -5.5 %, Apr -9.0 %, <br />May - 12.0 %, Jun - 14.5 %, Jul- 15.0 %, Aug - 13.5 %, Sep - 10.0 %, Oct -7.0 %, Nov -4.0 %, and Dec - <br />3.0%. The monthly distribution for elevations above 6500 feet imsl is: Jan -1.0 %, Feb -3.0 %, <br />Mar -6.0 %, Apr -9.0 %, May - 12.5 %, Jun-15.5%, M-16.0%, Aug - 13.0 %, Sep - 11.0 %, Oct -7.5 %, <br />Nov -4.0 %, and Dec -1.5 %. <br />5. Irrigation: Provide a map showing the proposed lands to be irrigated. Provide information <br />on the types of crops to be irrigated and the method of irrigation. Analysis *of monthly <br />consumptive use shall be based upon the modified Blaney - Criddle method or other acceptable <br />methods or determination from previous court decrees for shares in same ditch. Estimates of <br />irrigation efficiencies and ditch conveyance efficiencies shall be based on acceptable <br />engineering references and standards. Need detail of water balance (i.e., historical diversions <br />versus crop irrigation requirement) to determine net stream depletion. Analysis shall show <br />depletions on a monthly basis. <br />6. Drinking & Sanitary: Estimate the number of full time employees, part time employees, <br />and visitors that are expected and the expected demand in gallons per day per person. <br />Describe the expected method of water treatment. Septic/leach fields are assumed to have a <br />consumption of 10% of diversions and municipal systems are assumed to have a <br />consumption of 5% of diversion. Other consumption rates must be supported with <br />engineering documentation. If animals are to be watered, detail the type of animals and the <br />