My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Draft Environmental Assesment and Finding of No Significant Impact Gunnision River Activities February 1995
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Draft Environmental Assesment and Finding of No Significant Impact Gunnision River Activities February 1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2012 3:09:46 PM
Creation date
8/8/2012 3:04:48 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Draft Environmental Assesment and Finding of No Significant Impact Gunnision River Activities February 1995
State
CO
Basin
Gunnison
Date
2/17/1995
Title
Draft Environmental Assesment and Finding of No Significant Impact Gunnision River Activities February 1995
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CONTENTS <br />CHAPTER 1- INTRODUCTION ... ............................... 1 <br />Purpose and Need .......... ............................... 1 <br />Background Information ...... ............................... 2 <br />Recovery Program ............ 2 <br />Gunnison River ........ ............................... 3 <br />Related Projects ........... ............................... 3 <br />CHAPTER 2 - PROPOSED ACTIONS AND ALTERNATIVES ............... 5 <br />Proposed Actions ......................................... 5 <br />Fish Passageway Design ... ............................... 5 <br />Fish Passageway Construction .............................. 7 <br />Fish Passageway Operation . ............................... 7 <br />Interim Water Agreement .. ............................... 8 <br />Alternatives .............. ............................... 8 <br />NoAction ........... ............................... 8 <br />Fish Passageway ....... ............................... 9 <br />Interim Water Agreement .. ............................... 9 <br />Alternative A (Protection of Basin Water Users through Operational <br />Flexibility) .... ............................... 9 <br />Alternative B (Protection of Basin Water Users through Contracts) ..... 10 <br />Alternative C (No Special Protection of Basin Water Users) ......... 10 <br />CHAPTER 3 - AFFECTED ENVIRONMENT AND ENVIRONMENTAL <br />CONSEQUENCES ........... .............................11 <br />General.................. <br />.............................11 <br />Vegetation and Land Use ..... ............................... <br />11 <br />Existing Conditions ...... ............................... <br />11 <br />Impacts............... .............................12 <br />River Flows, Water Rights, and Water Use ......................... <br />12 <br />Existing Conditions ...... ............................... <br />12 <br />Impacts............... .............................15 <br />Fish and Wildlife <br />20 <br />........................................... <br />Existing Conditions ..... ............................... <br />20 <br />Impacts...... ......... .............................21 <br />Endangered Species ......... ............................... <br />21 <br />Existing Conditions ...... ............................... <br />21 <br />Impacts............... .............................23 <br />Socio - Economic Factors <br />25 <br />...... ............................... <br />Existing Conditions ...... ............................... <br />25 <br />Impacts............... .............................25 <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.