My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Final Environmental Assesment and Finding of No Significant Impact Gunnision River Activities June 1995
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Final Environmental Assesment and Finding of No Significant Impact Gunnision River Activities June 1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2012 3:14:19 PM
Creation date
8/8/2012 3:04:14 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Final Environmental Assesment and Finding of No Significant Impact Gunnision River Activities June 1995
State
CO
Basin
Gunnison
Date
6/1/1995
Title
Final Environmental Assesment and Finding of No Significant Impact Gunnision River Activities June 1995
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
and replaced the supply through more efficient municipal systems. In addition other salinity <br />control measures such as canal lining are being considered in the Uncompahgre Valley. <br />Over the last decade, several new projects have been considered on the river that could be <br />developed for hydropower, transmountain diversion, or water supply. These include the Rocky <br />Point and Union Park Projects in the headwater reaches; the AB Lateral Project near Montrose; <br />and the Dominguez Project located between Delta and Grand Junction. Of these, the AB Lateral <br />Project is the only one that has progressed to the stage of filing a draft and final environmental <br />impact statement. Presently, the Dominguez Project, which would be developed for hydropower <br />and water storage, has applied for a preliminary study permit through FERC. The Department <br />of Interior submitted comments on the study permit and cited significant concerns with <br />endangered species, wilderness, cultural resources, recreation and aesthetics, and other issues. <br />The National Park Service has an unquantified Federal reserved water right on the Gunnison <br />River for purposes of Black Canyon of the Gunnison National Monument. The Fish and <br />Wildlife Service is conducting studies of the Gunnison River under the Endangered Species Act. <br />These studies will result in a "Biological Opinion" on the operation of the upstream reservoirs <br />of the Aspinall Unit. The Biological Opinion is a report that contains recommendations on how <br />the operations (water releases) can be changed to protect and help recover endangered fish. Test <br />flows have been provided from the Aspinall Unit for the last 3 years to assist in determining <br />fishery needs. The Biological Opinion is scheduled to be completed in 1997 or 1998, and a <br />NEPA document will be prepared to address any changes in Aspinall Unit operations which may <br />be necessary as a result of the Biological Opinion. <br />x <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.