My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda: Management Committee Meeting November 23 1993
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Agenda: Management Committee Meeting November 23 1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2013 1:22:37 PM
Creation date
8/7/2012 4:01:49 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Agenda: Management Committee Meeting November 23 1993
State
CO
Date
11/23/1993
Title
Agenda: Management Committee Meeting November 23 1993
Water Supply Pro - Doc Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />FY 94 SCHEDULE (PROPOSED) <br />BIOLOGY COMMITTEE <br />December 93 <br />- Biology Committee concludes initial review of Genetics Management <br />Guidelines. <br />- Review Draft Annual Propagation Operation Plan <br />January 94 - Review Draft Coordinated Hatchery Facility Plan <br />- Annual Report Meeting (Presentation of selected studies /projects, <br />Jan 12 -13) <br />- Technical reviews of annual reports (completed prior to <br />administrative review meeting) <br />- Formulate recommendations to Management Committee regarding <br />update of RIPRAP (Jan 12 -13) <br />- Administrative review of all BC related projects (Jan 25 -26) <br />- Revised Genetics Guidelines report to BC and final comments to <br />Propagation Coordinator. <br />- Prepare report detailing long term augmentation needs <br />- Finalize Annual Propagation Operation Plan (Jan 25 -26) <br />- Comments on Coordinated Hatchery Facility Plan <br />February 94 <br />- Report detailing long term augmentation needs of RIP (due Feb. 1 <br />possible delay required) <br />- Genetics Management Plan due to BC for review (Feb 15) <br />March 94 <br />- Comments from BC due on Genetics Management Plan (March 15) <br />- Initiate development of strategies and specific tasks /projects to <br />implement the nonnative species control element of RIP (based on <br />Utah's nonnative species management report) <br />- Complete review of LFL report "Impacts of Electrofishing on Fish" <br />and make recommendations to Management Committee. <br />April 94 <br />May 94 <br />June 94 <br />July 94 <br />- Significantly revised or new Scopes of Work for FY95 due to BC by <br />April 1. <br />- Subcommittee review of new or revised Scopes of Work beginning <br />April 8. <br />- BC Review (including subcommittee comments) of new or revised FY <br />95 Scopes of Work (May 10 -11 meeting) <br />- Scopes of Work for FY 95 ongoing, on -track projects due June 3 <br />for review. <br />- Develop recommended FY 95 workplan for Management Committee (June <br />22 -23 meeting) <br />
The URL can be used to link to this page
Your browser does not support the video tag.