Laserfiche WebLink
9. The estimated time required for coinmcnccmcr►t of work is 3 year's for completion of Construction <br />is years <br />10. 'Tile accompanying map is pupated in accordance with the State Engineer's Manual of Regulations and Instructions for filing <br />apl)llcatlons and is hereby declared a part of this api)hcatlon. 'rill' state Engineer may require the filing of details -d Construction <br />plans. <br />under per►altics of perjury, I doclarc that I haver (- Xall))nc(I this application and to the hest of illy knowledge and belief it is true, <br />correct and complete. <br />Signature of Applicant or Agent - -_ <br />Date � �)lte� <br />NOTE: If construction under this application is for enlargement of an existing reservoir, a consent to this enlargement should be <br />attached hereto from the present owners. <br />REMARKS <br />The Three Forks .Dam is a proposed storage facility in the Little Snake River <br />Water Management p. -oject of the State of Wyoming. <br />NOTICE <br />A Manual of Regulations and Instructions for filing applications will be furnished by the State Engineer's Office upon request. By carefully <br />complying with the instructions contained in the Manual, much trouble and delay will be saved the applicant, the professional engineer or land <br />surveyor, and the State Engineer's Office. <br />This application must be accompanied by maps in duplicate, prepared in accordance with the Manual and by a filing fee of twenty -five dollars <br />($25.0!1). <br />Applications returned for corrections must be resubmitted to the State Engineer within 90 days with the corrections properly made; otherwise <br />the filing will be canceled. <br />This application, when approved, does not constitute a complete water right. It is your authority to begin construction work, which must be <br />commenced within the time allowed in the permit. <br />Notice of commencement of work and completion of the work described in the permit, must be filed in the State Engineer's Office before the <br />expiration of the time allowed in the permit. <br />If extensions of time beyond the time limits set forth in the permit are required, requests for same must be in writing, stating why the additional <br />time is required, and must be received in the State Engineer's Office before the expiration of the time allowed in the permit. <br />To perfect your water right. your Water Division Superintendent, or his authorized representative, will contact you after you have submitted <br />notice to the State Engineer stating you have completed the construction as described in your permit. After execution of the proof, it will be con- <br />sidered by the State Board of Control, and, if found to be satisfactory, the Board will issue to you a Certificate of Appropriation which will con- <br />stitute a completed water right. <br />The granting of a permit does not constitute the granting of right -of -way. If any right -of -way is necessary in connection with the application, it <br />should be understood that this responsibility is the applicant's. <br />L <br />