Laserfiche WebLink
EASEMERr (Dam, etc.) <br />19p <br />E �snti l WATER <br />BOARD <br />THIS Ek.sDUM, dated this �K, day of � 1982, fran the <br />ITED <br />UN STATES OF AMERICA, acting by and th h e Regional Forester, Forest <br />Service, U. S. Department of Agriculture, 'fiereiyafter called "Grantor," to <br />the City of Cheyenne, Wyoming - Board of Public Utilities, hereinafter called <br />"Grantee." <br />WHEREAS, the Grantee has requested authorization to Construct the Cheyenne <br />Stage II Water Diversion Project on National Forest lands within the Medicine <br />Bow National Forest, State of Wyaning. <br />WHEREAS, the Grantee constructed Stage I of the Cheyenne Water Diversion <br />Project cn Medicine Bow National Forest lands under authorization of the Act <br />of June 4, 1897, as documented in a Special Use Permit issued by Forest <br />Supervisor W. E. Augsbach on May 15, 1962 and amended November 23, 1964. <br />WHEREAS, the passage of the Federal Land Policy and Management Act of October <br />21, 1976 (90 Stat. 2743, et se� q) repealed that part of the Act of June 4, <br />1897 that applies to the issuance of rights - of-way on National Forest System <br />lands. <br />NOW TEEREIURE, Grantor does hereby grant to Grantee, an easement under 36 CFR <br />251.53 (1.)(1.) for a right- of-way for the construction, operation, and <br />maintenance of the Cheyenne Water Diversion Project (Stages I and II). The <br />area authorized by this easement is limited to those improvement areas within <br />the Medicine Bow National Forest that are depicted on a map entitled "Exhibit B <br />- Cheyenne Water Project - Location Map," a copy cf which is attached and <br />hereby made a part of this project. <br />The improvement areas will occupy 1,900 acres and /or 67.47 miles, more or <br />less, and will consist of the Little Snake Diversion Pipeline, Hog Park <br />Tunnel, Bog Park Drop, Hog Park Dam and Reservoir, Rib Roy Dam and Reservoir, <br />Lake Owen Dan and Reservoir, Rob Roy to Douglas Creek Diversion Dam Pipeline, <br />Douglas Creek to Lake Owen Pipeline and Interceptors, Lake Creek Diversion <br />Pipeline, Lake Owen to Crow Creek Pipeline, South Middle Crow Delivery <br />System, and the necessary access roads. The rights -of -way for pipelines and <br />roads are limited to 100 feet in width plus such additional width as needed to <br />acc=nodate cuts and fills. The rights- of-way for reservoirs, dams, and <br />appurtenant structures, other than pipelines and roads are limited to the area <br />actually occupied. <br />This grant is made subject to the following conditions applicable to Grantee, <br />its permittees and contractors: <br />1. This grant is issued for a period of 30 years ending December 31, 2011, <br />but �s ;renewable provided Grantee will aanply with the then - existing rules <br />and regulations governing the occupancy and use of National Forest land. <br />Upon cmVletion of construction, however, the Grantee shall furnish <br />the Forest Service with three sets of "as- constructed" location plats. <br />This easement will then be revised as deemed necessary by the Regional <br />Forester to authorize the continued occupancy and maintenance of the <br />rights- of-way as constructed. <br />2. The Grantee recognizes and accepts the fact that this easement, insofar <br />as endangered and threatened wildlife species are affected, is granted <br />by virtue of a no-- jeopardy biological opinion issued by the U. S. Fish <br />and Wildlife Service on May 29, 1981. Should the U. S. Fish and Wildlife <br />Service subsequently issue a " jeopardy" opinion the Grantor will withdraw <br />this easement: - - <br />