My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150329 Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150329 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2013 3:02:12 PM
Creation date
8/2/2012 10:04:42 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150329
Contractor Name
La Veta, Town of
Contract Type
Loan
Water District
2
County
Huerfano
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
At its January 2012 meeting, the CWCB approved a Small Project Loan from the <br />Construction Fund to the BORROWER in an amount up to $369,000 for PROJECT <br />costs, not to exceed 90% of the cost of the PROJECT, with a loan origination fee of <br />1% in accordance with CWCB Policy No. 16, at an interest rate of 3.00% per <br />annum for a repayment term of 30 years. <br />SECTION 5 — SCHEDULE OF EXISTING DEBT <br />Colorado Water Resources & Power Development Authority, annual payment <br />$50,117, remaining balance $1,102,604, maturity date 2039. <br />SECTION 6 — ADDITIONAL CONDITIONS & CONTRACT REQUIREMENTS <br />No additional contract requirements. <br />SECTION 7 — CONSTRUCTION FUND PROGRAM PROCEDURES <br />A. The BORROWER shall employ an engineer, registered in the state of <br />Colorado to prepare plans and specifications for the PROJECT. <br />B. The BORROWER's and the Engineering Consultant's plans and specifications <br />must be submitted to the CWCB staff for verification of compliance with the <br />terms of this Contract when available prior to bidding. Any modifications to <br />the plans and specifications must be approved in writing by the CWCB staff. <br />C. For plans and specifications for all jurisdictional dams and reservoirs, as <br />defined by § 37-87-105 C.R.S., the BORROWER shall provide a letter of <br />approval from the State Engineer's Office prior to construction. <br />D. CWCB staff must be present at bid opening and must approve the award of <br />the construction contract. <br />E. The BORROWER shall contract for the construction of the work with <br />responsible and capable Construction Firms, which said Construction Firms <br />shall be selected by the BORROWER and found acceptable by the CWCB <br />staff. <br />F. The BORROWER must provide a copy of the executed construction contract <br />documents consisting of the contractor's proposal, construction contract, <br />performance bond, payment bond, notice of award, notice to proceed, <br />sample change order, and sample field order, as well as the advertisement <br />for bid and bid bond at bidding. After the CWCB staff verifies that these <br />documents comply with the terms of this contract, the BORROWER may issue <br />the notice to proceed to the Construction Firms. <br />G. The BORROWER shall conduct a pre- construction conference at which time <br />the CWCB staff shall have the opportunity to review and approve the <br />construction schedule. <br />H. If the CWCB staff determines that the PROJECT requires a resident <br />Appendix 1 to Loan Contract C150329 <br />Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.