My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150299 Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150299 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2013 2:25:47 PM
Creation date
8/2/2012 9:27:06 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150299
Contractor Name
Lake Canal Reservoir Company
Contract Type
Loan
Water District
0
County
Larimer
Weld
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
s • <br />pproval and filing. <br />K. i pon completion of the PROJECT construction, the BORROWER shall arrange a final <br />i sDection for the CWCB staff. <br />L. The BORROWER shall pay all of the expenses related to the PROJECT when such bills <br />are due. <br />710t9 — ELIGIBLE EXPENSES. The following items are eligible for loan disbursements. <br />A. reparing final designs and specifications for the PROJECT. <br />B. reparing bid and construction contract documents. <br />C. 3reparing environmental assessment or environmental impact statements, and <br />therwise complying with the Federal National Environmental Policy Act. <br />D. omplying with all federal, state, and local regulatory requirements, including the <br />btaining of all required permits. <br />E. ish and wildlife mitigation measures required by federal, state, or local laws and <br />eaulations. <br />F. kctual construction as called for in the design documents and in change orders <br />pproved by the CWCB and the BORROWER. <br />G. ngineering services for construction management, including design and <br />nstruction management for CWCB- approved change orders. <br />H. nterest during completion of the PROJECT pursuant to Paragraph A.4 of the <br />I. -egal services for reviewing engineering services contracts, reviewing this Contract, <br />eviewing construction contract documents, and for complying with all federal, state, <br />nd local regulatory requirements. <br />M. ROJECT- related expenses incurred prior to the Effective Date of this contract in <br />ccordance with the approval of this loan. <br />10 — DISBURSEMENT SCHEDULE <br />For Project costs: The BORROWER shall prepare a periodic progress report which <br />=tains a statement of the PROJECT costs expended for that period and shall <br />orward said statement to the CWCB. After receipt of the periodic progress report <br />rom the BORROWER, and review and acceptance of the items therein as eligible <br />;xpenses as described below, the CWCB will pay to the BORROWER the amount set <br />orth in the report or such portion that has been approved by the CWCB. Such <br />)ayment shall be made within thirty (30) days from the CWCB's approval of each <br />)rogress report. <br />V 11 — TIME FOR PERFORMANCE <br />'ROJECT Beginning: Upon Effective Date of this Contract (the date this contract is <br />,igned by the State Controller or his designee). <br />'ROJECT Finish: Four (4) years from the Effective Date of this Contract <br />Appendix 1 to Loan Contract C150299 <br />Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.