Laserfiche WebLink
such as the Climax and Wolf Creek <br />The Westwide Study stated that ". . <br />Pass experiments conducted by <br />weather modification appears to be <br />Colorado State University, and the <br />the most promising source of- new <br />Bureau's Colorado River Basin Pilot <br />water supply in the Western United <br />Project. The validity of weather <br />States," and the Advisory Board's <br />modification as a means of increasing <br />report endorsed winter seeding as <br />precipitation was also a major <br />". ._ . the most advanced . . . and <br />conclusion of the Westwide Study_ and <br />closest to significant broad - scale <br />the U.S. Secretary of Commerce's <br />operational use of all cloud seeding <br />Weather Modification Advisory Board. <br />possibilities." <br />30,000 <br />- - _ <br />- - <br />WIND <br />- <br />25,000 <br />—♦ ' TO KNOTS - <br />•. �� �s <br />r 20,000 <br />Y <br />- <br />W <br />- <br />— r__20° <br />f15,000 <br />- CLOUD TOP <br />.x,10 45 <br />... <br />., <br />AUGMENTED <br />J <br />a <br />-. .. <br />• SUPERCOOLED DROPS <br />. _ <br />l �. �•iia,�.l SNOW <br />�� "•'"" •' ••• •sue <br />10.000 <br />.. <br />- CLOUD <br />- <br />- BASE <br />s,00a <br />SILVER IODIDE GENERATOR <br />10 <br />- . - 20 - 30 - <br />MILES <br />IDEALIZED MODEL SHOWING METEOROLOGICAL CONDITIONS THAT WILL RESULT IN INCREASED SNOWFALL IF <br />CLOUDS ARE SEEDED WITH SILVER IODIDE PARTICLES <br />PROGRAM COSTS AND BENEFITS <br />A fully operational Basin -wide cloud <br />seeding program would produce an <br />CREST is an 8 year, $88 million* <br />estimated 2',263,000 acre -feet of <br />program designed to demonstrate the <br />water annually valued at $139.4 <br />million per year. The Basin -wide <br />capability of cloud seeding to <br />program will cost between $12 and $16 <br />augment the flow of the Colorado <br />million annually, or approximately $5 <br />River. An estimated 410,000 acre - <br />to-$7 per acre -foot of water <br />feet of water will be produced <br />produced. <br />annually during years that seeding is <br />conducted. The additional water is <br />The benefit - cost ratio of_a Basin - <br />valued at $11.9 million each year in <br />wide operational program i's- estimated <br />increased hydroelectric energy <br />to be from 9:1 to 12:1. The entire <br />production, salinity reduction, and <br />cost_of the 8-year CREST program is <br />increased water supplies for <br />less than, the value of benefits from <br />industrial, agricultural and <br />a single year of Basinwide <br />recreational use. <br />operations. <br />