My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Fort Lyon Canal: The First 100 Years 1897 to 1997
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
The Fort Lyon Canal: The First 100 Years 1897 to 1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2012 10:36:25 AM
Creation date
8/1/2012 1:15:26 PM
Metadata
Fields
Template:
Water Supply Protection
Description
The Fort Lyon Canal: The First 100 Years 1897 to 1997
State
CO
Date
1/1/1997
Author
Dodson, O. Ray
Title
The Fort Lyon Canal: The First 100 Years 1897 to 1997
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
water rights located upon them, and the lands with wa- <br />ter rights were mortgaged to various loan companies at <br />an average valuation of $12.50 per acre, the funds thus <br />raised being used for construction of canals and the <br />improvement of the lands. To the settlers owning their <br />own lands in the territory east of Horse Creek water <br />rights were sold at an average price of $10.00 per acre, <br />the allotment of water under such rights being 1.44 sec- <br />ond -feet for each 80 acres, or $800.00 for an 80 -acre <br />water right. These water rights are now worth $5,500.00 <br />each, or more. <br />Many thousands of acres were seeded to alfalfa in the <br />spring of 1888, not only by the Company but by the <br />farmers, and a fair stand was obtained notwithstanding <br />the numerous breaks which occurred in the new canal <br />banks, often depriving the lands of water or delaying its <br />delivery at critical times. This was also partly due to <br />inexperience of the farmers and to the lack of knowl- <br />edge of how to irrigate and to handle water. <br />During the winter of 1888 and 1889 settlers who had <br />taken up lands north of Lamar induced Mr. Henry to <br />extend his canal from its terminus at Gageby Arroyo to <br />Big Sandy Creek, a distance of 73 miles, and about the <br />same time, or before, that portion above Gageby to the <br />river was enlarged to a capacity of 761.8 cubic feet per <br />second of time. Following the completion of the canal <br />and the application of water decrees of priority were <br />obtained giving its first priority for 164.64 cubic feet per <br />second, as of date April 1511, 1884, and its second prior- <br />ity, for 597.16 second feet, as of date March V, 1887. <br />The entire cost of the canal up to this time was about <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.