Laserfiche WebLink
Back to CF Appendices <br />Colorado Water Conservation Board <br />Long -Term Financial Projection <br />CFExpenditures <br />Schneider Ditch Co. <br />Owl Creek Supply and Irrigation <br />Rehabilitate diversion structure <br />Rehabilitate ditch structures <br />1 <br />1 <br />Prospect 99 <br />Peas. Study 99 <br />Division of Wildlife <br />Lake Avery Enlarg. (Big Beaver Dam) <br />6 <br />Summit Res. and Ditch Co. <br />Summit Res. Dam and Ditch Improv. ♦ <br />7 SB 97 -008 <br />Dolores Water Conservancy District <br />Wet Pack s <br />7 Prospect 99 <br />603 USER / <br />Ridges Basin Dam (Animas- LaPlata) <br />7 C- 153570 <br />Summit Res. and Ditch Co. <br />Summit Res. Dam and Ditch Improv. <br />7 C- 153770 . <br />Pinion Mesa Ranches Community Associ <br />.Outside Irrigation System <br />7 C- 153774 " <br />Pagosa Area Water & San. Dist. ✓ <br />Martinez Reservoir <br />7 GP 10 -10 -96 <br />Pine River Canal Co. - <br />Pine River Canal Lining <br />7 GP 10 -10 -96 <br />439 Pagosa Area Water & San. Dist. / <br />Steven's Lake <br />7 HB 93 -1273 ,e <br />521 Red Mesa Ward Res. Co., <br />Red Mesa Ward Res. Rehab. & Enl. <br />7 HB 95 -1155 <br />Lilylands Canal & Res. Co. <br />Lilyland Reservoir Enlargement <br />7 OP 10 -10 -96 <br />Mancos Water Conservancy Dist.. <br />Jackson Gulch Res. Refinance <br />7 OP 10 -10 -96 <br />Town of Bayfield ' <br />Raw Water Pipeline <br />7 OP 10 -10 -96 <br />Pagosa Pipeline Co. ' <br />Raw Water Pipeline <br />7 Small Proj. Loa <br />Bigbee Brothers Cattle Co. <br />Harris Bros. & Boon #2 <br />7 Restricted List <br />Pine River Irrigation District <br />Rural Water System <br />7 SB 97 -008 <br />Pine River Canal Co. <br />Pine River Canal Tunnel Hill Project s <br />7 SB 99 -173 <br />