My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Technical Work Group Meetings 2009
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Technical Work Group Meetings 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2012 2:04:07 PM
Creation date
7/26/2012 1:33:07 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Technical Work Group Meetings 2009
State
CO
Date
9/29/2009
Title
Technical Work Group Meetings 2009
Water Supply Pro - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Glen Canyon Dam Technical Work Group Page 9 <br />DRAFT Minutes of March 16 -17, 2009, Meeting <br />deferred, replacement and maintenance of equipment. There are a lot of things falling apart and they don't <br />typically budget enough to replace a lot of the equipment. There were some positions in DASA they were <br />trying to fill especially in the GIS and remote sensing arenas. They also did some reorganization where they <br />moved some people out of the biology program into DASA to provide statistician support and study design <br />support in DASA and that created some funding needs in DASA and the biology program. They were also <br />trying to restore funding for certain projects that were cut at the end of the year. The one most notably was <br />the whole control network was zeroed out in FY09 budget and after a long discussion they decided that <br />needed to be added back in. He was also unaware that Reclamation was establishing a non - native <br />contingency fund but they also created a couple of contingency funds to deal with high priority, <br />unanticipated needs primarily in the overflight they're doing in FY09 and in the non - native control project in <br />FY09. <br />The Summary Table indicates there was $2,332,308 in non - discretionary funds and the sources of that <br />were almost $2.6 million from the annual workplan and the HFE. They received some cash contributions <br />from the Southwest Biological Science Center (SBSC) who they had loaned money to last year to help <br />support the science symposium and they paid GCMRC back this year. There was $207K in the CPI <br />increase and they actually had a reduced burden rate so they were able to free up almost $1 OK for their <br />activities. That equals a total of $2,863,781 that was available. He reviewed the details of the allocations. <br />The members expressed concerns about having sufficient money to do the overflights, $35K to replace a <br />GCMRC, and the amount of money being carried forward, <br />USBR FY2010 -11 Preliminary Budget Development. Dennis distributed copies of his PPT, "Bureau of <br />Reclamation GCDAMP Preliminary FY10 -11 Budget (Attachment 7e). He said the AMWG passed the <br />biennial budget process in 2004 but at the present time it's a rolling 2 -year process rather than a strict two - <br />by -two process. In the second year the budget is reviewed and additions made. He said the draft budget the <br />AMWG requested in 2004 was to assess whether or not their priorities were identified and dealt with. They <br />went through a workshop in 2004 and they ranked their priorities and identified any issues the TWG wanted <br />to alert them to, things they were unable to reach resolution on and wanted feedback. <br />AIF: Public Outreach Ad Hoc Group POAHG Repo . Doug Hendrix distributed copies of the POAHG's <br />progress and gave a corresponding PPT(Attachment 70. He went over POAHG budget for FY2010 -11. He <br />reminded the TWG that any products developed are vetted through the AMWG for a full review and <br />approval before they go into operation, either on the website, on display at Glen Canyon Dam, or for public <br />outreach purposes. <br />Bill Davis said there was an interesting article in the paper this morning about the river washing away and <br />wondered if the POAHG had prepared it. Doug said he wasn't aware of the article. Bill said he was curious <br />that if the POAHG is doing all this really good work, it's disturbing to see an article which undermines what <br />the POAHG is trying to do. Leslie said it was a Park Service article that appeared in the Flagstaff <br />newspaper. Doug said they try to communicate in a consolidated voice on behalf of the program. He said <br />there are times when members have to respond on behalf of their organization. Steve Mietz said the project <br />was funded with Park funds, not AMP funds. <br />GCMRC AMP Preliminary Budget. John Hamill provided a copy his February 13, 2009 memo and <br />spreadsheet (Attachment 8a), and said he would give an overview and explain the differences. He said the <br />majority of the budget was developed with the BAHG conference calls. He went through the individual goals <br />and addressed those which required more focus. <br />Q: Is there a reason why the $1 million of USGS directed toward overhead does not increase with the CPI? 1 know <br />originally there was a deal made but as time goes on, that becomes more significant and it seems like within the USGS <br />budget, the capability would be there to increase with the CPI. (Oster) <br />A: 1 would think so and it's an issue we've raised because this pays what we call our cost -share and our cost -share is <br />increasing and the $1 million isn't enough to cover our needs and part of that is the costs of this program keeps going <br />