My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Evaluation of Water Year 2011 Glen Canyon Dam FLow Release Scenarios on Downstream Sand Storage along the Colorado River in Arizona
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Evaluation of Water Year 2011 Glen Canyon Dam FLow Release Scenarios on Downstream Sand Storage along the Colorado River in Arizona
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2012 3:58:04 PM
Creation date
7/25/2012 3:40:01 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Evaluation of Water Year 2011 Glen Canyon Dam FLow Release Scenarios on Downstream Sand Storage along the Colorado River in Arizona
State
AZ
Author
Wright, Scott; Grams, Paul
Title
Evaluation of Water Year 2011 Glen Canyon Dam FLow Release Scenarios on Downstream Sand Storage along the Colorado River in Arizona
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1400 <br />^ z 1200 <br />;o <br />C7 U 1000 <br />0 W 800 <br />Z <br />U Q 600 <br />aco <br />Z p 400 <br />200 <br />0 <br />x <br />MLFF SDF EMV SYR SAS IDR <br />1400 <br />Z 1200 <br />w0 <br />F- <br />1000 <br />W 800 <br />Z <br />l< Z 600 <br />Q � <br />Z p 400 <br />Z 200 <br />0 <br />AI <br />MLFF SDF EMV SYR SAS IDR <br />EXPLANATION <br />�— Base simulations <br />Uncertainty envelopes <br />a <br />Figure 10. Modeled annual sand budgets for the 8.23 million acre -foot annual hydrologic scenario. A, Sand budget <br />for Marble Canyon. B, Sand budget for eastern Grand Canyon. Vertical lines denote range based on <br />uncertainty simulations. <br />15 <br />MLFF SDF EMV SYR SAS IDR <br />1400 <br />Z 1200 <br />w0 <br />F- <br />1000 <br />W 800 <br />Z <br />l< Z 600 <br />Q � <br />Z p 400 <br />Z 200 <br />0 <br />AI <br />MLFF SDF EMV SYR SAS IDR <br />EXPLANATION <br />�— Base simulations <br />Uncertainty envelopes <br />a <br />Figure 10. Modeled annual sand budgets for the 8.23 million acre -foot annual hydrologic scenario. A, Sand budget <br />for Marble Canyon. B, Sand budget for eastern Grand Canyon. Vertical lines denote range based on <br />uncertainty simulations. <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.