Laserfiche WebLink
TABLE 6 <br />LAKE ISABELLE REHABILITATION <br />ALTERNATIVE 2 - RELOCATE VALVE <br />ITEM <br />DESCRIPTION <br />QUANTITY <br />UNITS <br />UNIT <br />PRICE <br />AMOUNT <br />1 <br />Insurance, Bonds <br />1 <br />L.S. <br />$ 22,200.00 <br />$ 22,200 <br />2 <br />Mobilization, Demobilization <br />1 <br />L.S. <br />$ 48,597.001 <br />$ 48,600 <br />3 <br />1 Helicopter Time for Mob/Demob and Support <br />1 <br />L.S. <br />$ 184,800.00 <br />$ 184,800 <br />4 <br />Remove Building Stone and Wood Substructure <br />1 <br />L.S. <br />$ 5,957.00 <br />$ 6,000 <br />5 <br />Demolition of Wall to Access Gate <br />1 <br />L.S. <br />$ 4,765.00 <br />$ 4,800 <br />6 <br />7 <br />Removal of gate Disk <br />Removal of Rocks and Debris <br />1 <br />1 <br />L.S. <br />L.S. <br />$ 2,585.00 <br />$ 4,765.00 <br />$ 2,600 <br />$ 4,800 <br />8 <br />Encase Pie and valve Assembly <br />1 <br />L.S. <br />$ 7,204.00 <br />$ 7,300 <br />9 <br />1 Grout Wall Access <br />1 <br />L.S. <br />$ 2,619.00 <br />$ 2,700 <br />10 <br />Installation of Steel Stress Plate <br />1 <br />L.S. <br />$ 13,875.00 <br />$ 13,900 <br />11 <br />Installation of Angle Iron Mounting <br />1 <br />L.S. <br />$ 7,602.00 <br />$ 7,700 <br />12 <br />Cut Steel for Ouhet Cover Plate <br />1 <br />L.S. <br />$ 19,403.00 <br />$ 19,500 <br />13 <br />Place Onsite Stone <br />1 <br />L.S. <br />1 $ 4,705.00 <br />$ 4,800 <br />14 <br />Installation of Outlet Pie and Gate <br />1 <br />L.S. <br />$ 86,465.00 <br />$ 86,500 <br />15 <br />Construct Bulkhead <br />1 <br />L.S. <br />$ 7,158.00 <br />$ 7,200 <br />16 <br />Encase Outlet Pi a in Foam Insulation <br />1 <br />L.S. <br />$ 5,290.00 <br />$ 5,300 <br />17 <br />Insulate Pie <br />1 <br />L.S. <br />$ 5,918.00 <br />$ 6,000 <br />18 <br />Insulate New Building <br />1 <br />L.S. <br />$ 16,115.00 <br />$ 16,200 <br />19 <br />Demolition of E?dsting Building <br />1 <br />L.S. <br />$ 6,182.00 <br />$ 6,200 <br />20 <br />Installation of Foam Plug in the Shaft <br />1 <br />L.S. <br />$ 2,315.00 <br />$ 2,400 <br />21 1 <br />Installation of Shaft Cover <br />1 <br />L.S. <br />$ 5,440.00 <br />$ 5,500 <br />TOTAL CONSTRUCTION COST $ 465,000 <br />CONTINGSNCY(20%) $ 93,000 <br />ENGINEERINGTEGALISURVEYING $ 93,000 <br />TOTAL F$ 651,000 <br />Allen Lake and Lake Isabelle — 12.012 <br />Left Hand Ditch Company Page 18 <br />