My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150336 Feasibility
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150336 Feasibility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2015 9:24:48 AM
Creation date
7/25/2012 7:53:36 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-088
C150336
Contractor Name
Left Hand Ditch Company
Contract Type
Loan
Water District
5
County
Boulder
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
In addition to the work required to repair the existing gate an access platform and ladder system <br />will be required on the exterior of the building to provide adequate and safe access to the control <br />building. The addition of the access platform and ladder system is a potential limitation to this <br />alternative since it was not included in the permit application to the U.S. Forest Service. To <br />implement this alternative will require revising the permit from the U.S. Forest Service to address <br />the need for proper access to the gate building that meets the current OSHA requirements. <br />The complete breakdown of the work proposed and the cost of the work proposed for Alternative 1 <br />for Lake Isabelle is shown in Table 5. Due to the unique nature of this project Left Hand <br />Excavating helped in the determination of the costs for the Lake Isabelle Rehabilitation <br />Alternative 1. <br />LAKE ISABELLE REHABILITATION <br />ALTERNATIVE 1 - UPGRADE EXISTING OUTLET WORKS <br />ITEM <br />DESCRIPTION <br />QUANTITY <br />UNITS <br />UNIT <br />PRICE <br />AMOUNT <br />1 <br />Insurance, Bonds <br />1 <br />L.S. <br />$ 18,500.00 <br />$ 18,500 <br />2 <br />Mobilization, Demobilization <br />1 <br />L.S. <br />$ 21,795.00 <br />$ 21,800 <br />3 <br />Helicopter Time for Mob/Demob and Su2port <br />1 <br />L.S. <br />1 $ 6,800.00 <br />$ 6,800 <br />4 <br />Remove Building Stone and Wood Substructure <br />1 <br />L.S. <br />$ 118,800.00 <br />$ 118,800 <br />5 <br />Demolition of the Ladders and Platfomis <br />1 <br />L.S. <br />$ 9,375.00 <br />$ 9,400 <br />6 <br />Removal of Rocks and Debris Surrounding P' e <br />1 <br />L.S. <br />$ 9,540.00 <br />$ 9,600 <br />7 <br />Instlation of Steel Frame Work For the Ladder <br />1 <br />L.S. <br />$ 9,495.00 <br />$ 9,500 <br />8 <br />1 Installation of Gate and Outlet Pie <br />1 <br />L.S. <br />$ 24,960.00 <br />$ 25,000 <br />9 <br />Grout Around Pie <br />1 <br />L.S. <br />$ 144,555.00 <br />$ 144,600 <br />10 <br />Inlet Stucture Walls <br />1 <br />L.S. <br />$ 9,795.00 <br />$ 9,800 <br />11 <br />Repair Stone and Wood Substructure <br />1 <br />L.S. <br />$ 14,235.00 <br />$ 14,300 <br />TOTAL CONSTRUCTION COST $ 389,000 <br />CONTINGENCY(20%) $ 78,000 <br />INGIIsMERING/IEGAUSURVEYING $ 78,000 <br />TOTAL $ 545,000 <br />Allen Lake and Lake Isabelle — 12.012 <br />Left Hand Ditch Company Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.