My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150335 Feasibility
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150335 Feasibility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2012 8:39:30 AM
Creation date
7/25/2012 7:40:10 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150335
Contractor Name
Center of Colorado Water Conservancy District
Contract Type
Loan
County
Park
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
- ___ <br />.e <br />7. The use of the waters <br />Well #1 Domestic <br />Well i2 Domestic and 4 singlefamily cabi" <br />'London Mining & <br />Smelter Ditch 14lilling and Dom: -stir <br />Smelter Pipeline <br />Reservoir Storage for Millinq, <br />Domestic, Recreational <br />Fire Fighting and 'Fishing <br />Be (a) The smelter Pipeline Reservoir has a max - <br />LWO height of 10 feet. <br />(b) It is 428 feet in length. <br />(c) it has a total capacity of 22.602 acre <br />feet. <br />(d) The capacity of the reservoir fraw the <br />bottom of the outlet tube to the lowest <br />point on the spillway is 22.602 acre feet. <br />(a) Its capacity from the bottom of the <br />outlet tube to the lowest point in the <br />reservoir is none. <br />(f) The ditch leading to the reservoir is <br />the London Nininq & Smelting Ditch. <br />(g) That ditch has a capacity of 3.1 efs. <br />(h) There are no ditches leading from the <br />reservoir. <br />The priorities herein awarded sail[ London <br />Mining & Smelting Ditch, &Ala Smelter Pipeline (Stater <br />Engineer no. 6762) and fdaaelter Pipeline Reservoire,Nesll <br />#1 and Well #2 were filed in the Water Court in the <br />year of 1972, and shall be administered as having been <br />filed in that yearf and shall be junior to all priorities <br />filed in previous years. l+s between all rights, filed in <br />the same calendar year, priorities shall be deteminef d by <br />historical dates of appropriation and not affected by <br />the date of entry of ruling. <br />vATfm this day of , . 1977. <br />fiiwP! ! w.p*s . <br />.. .,, <br />x <br />a <br />F <br />
The URL can be used to link to this page
Your browser does not support the video tag.