My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150335 Feasibility
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150335 Feasibility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2012 8:39:30 AM
Creation date
7/25/2012 7:40:10 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150335
Contractor Name
Center of Colorado Water Conservancy District
Contract Type
Loan
County
Park
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7. <br />It is understood that all the normal work and /or materials required to complete the <br />Smelter Pipeline Reservoir are included in the unit or lump sum prices quoted in <br />this Bid Schedule. <br />Unit Price work has been computed in accordance with Paragraph 11.03.6 of the <br />General Conditions; except, Contractor's Unit Prices are not subject to increase. <br />Bidder acknowledges that estimated quantities are not guaranteed, and are <br />solely for the purpose of comparison of Bids, and final payment for all Unit Price <br />Bid items will be based on actual quantities, determined as provided in the <br />Contact Documents. <br />6.01 Bidder agrees that the Work will be substantially complete within 200 calendar <br />days after the date when the Contract Time commences to run, as provided in <br />paragraph 2.03 of the General Conditions, and will be completed and ready for <br />final payment in accordance with paragraph 14.07.B of the General Conditions <br />within 230 calendar days after the date when the Contract Time commences to <br />run. <br />a. PHASE 1 - Bidder agrees that substantial completion of the following <br />work items will be completed within 75 days after the date when the <br />Contract Time commences to run <br />1. Excavation and subgrade preparation for geomembrane liner <br />2. Installation of precipitation relief structure <br />3. Installation of discharge piping, new outlet structure, and metering <br />pit. <br />b. PHASE 2 - Bidder agrees that all remaining work items will be <br />substantially completed within 200 calendar days after the date when <br />the Contract Time commences to run. <br />These contract times include no allowance for adverse weather days. <br />6.02 The Bidder accepts the provisions of the Agreement as to liquidated damages in <br />the event of failure to complete the Work within the Contract Times. <br />The following documents are attached to and made a condition of this bid: <br />A. Required Bid Security in the form of i� t ►� <br />B. As required, a list of Project References <br />C. As required, the BIDDER'S Qualification Statement with supporting data <br />D. List of Subcontractors, Including Residency <br />E. List of Propposed Equipment. Contractors warrants that the equipment itemized <br />in the list will be available and used in the completion of the work <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.