Laserfiche WebLink
2. <br />3. <br />4. <br />A <br />7. <br />SMELTER PIPELINE BID SCHEDULE <br />Description <br />Unit Extended <br />er <br />Price Price <br />Mobilization and Demobilization, including all <br />necessary tools, qua ent, permits . <br />Lump Sump i. F Y,<r( % ifs Dollars <br />� <br />v <br />For excavation, screening and placement, as required, <br />of 34,400 cubic yards of material (including subgrade <br />preparation and cover over placed liner. <br />Egtima 34.400 cubic yards , .r <br />Dollars /CY <br />r <br />° ll c /. <br />For minimum 30 MIL PVC geomembrane liner materials. <br />Estimate 150.000 square feet <br />Dollars/SF"' <br />" AX <br />i <br />For supply and installation of minimum 8 oz geotextile <br />over and under layer. <br />Estimate 300.000 square feet <br />Dollars/SF <br />For removal of existing 10" diameter corrugated inlet <br />pipeline from the headgate to the existing reservoir <br />Estimate 450 feet <br />La �a c i L� Dollars/Foot <br />For supply and installation of new 8" diameter PVC <br />pipeline, (including rehabilitation of existing headgate <br />and /or installation of new headgate structure). <br />Estimate 750 feet <br />•It, � ' ; �' rc L°) Dollars/Foot <br />3 Z . X 't lac <br />For supply and installation of 6" diameter C -900 perforated <br />relief structure piping with 400' of perforated pipe and 150 <br />feet of non perforated pipe extending through the <br />embankment, including connection to the discharge pipeline. <br />Estimate 550 feet <br />G / <br />Te ty.At'# - , 81 tL-5 .itl / f , Dollars/Foot <br />'`� %q/ 7 �tx <br />18 <br />