Laserfiche WebLink
10/18/2001 <br />1,700,000 <br />1,600,000 <br />1,500,000 <br />1,400,000 <br />1,300,000 <br />1,200,000 <br />1,100,000 <br />1,000,000 <br />900,000 <br />m <br />800,000 <br />L <br />V <br />Q 700,000 <br />600,000 <br />500,000 <br />400,000 <br />300,000 <br />200,000 <br />100,000 <br />0 <br />-100 000 <br />April - July Streamflow Volume through Black Canyon <br />U') ti 0 <br />M LO ti 0) <br />M Lr) <br />d7 M LO <br />(0 W CO � <br />rte- r- fl- <br />00 00 00 00 <br />00 0) 0) 0') <br />a) 0') 0') oll <br />0') a) M 0') <br />0') 0') 0) 0) <br />0') CY) d) 0) <br />Water Year <br />per USFWS request <br />NIPS estimated request <br />® NPS revised estimate <br />— Aspinall inflow - Tunnel demand <br />II, <br />II <br />I <br />II 'i <br />�I <br />I <br />;I <br />I <br />L L_I L <br />I <br />L _j <br />1L <br />LI ICI' L� `' <br />U') ti 0 <br />M LO ti 0) <br />M Lr) <br />d7 M LO <br />(0 W CO � <br />rte- r- fl- <br />00 00 00 00 <br />00 0) 0) 0') <br />a) 0') 0') oll <br />0') a) M 0') <br />0') 0') 0) 0) <br />0') CY) d) 0) <br />Water Year <br />per USFWS request <br />NIPS estimated request <br />® NPS revised estimate <br />— Aspinall inflow - Tunnel demand <br />