Laserfiche WebLink
Modeling Results for <br />Colorado River Basin States' Modeling of <br />Colorado River and Reservoir Management Strategies <br />Lake Mead Operations <br />1) Lake Mead will operate to meet downstream demand, except when <br />additional releases are necessary to meet the Corps of Engineers flood <br />control procedures. <br />2) The Record of Decision for Interim Surplus Guidelines (as modeled in the <br />ISG -FEIS) is used to determine surplus conditions. The surplus criteria are in <br />effect for a 12 -year period beginning on January 1, 2005 and ending <br />December 31, 2016. At the conclusion of the 12 -year period, the surplus <br />criteria revert to the 70R Strategy. <br />3) The shortage assumptions used in the SIA -FEIS (Volume II, Appendix G) <br />are not applied to the operation of Lake Mead. <br />1 <br />