Laserfiche WebLink
a <br />i <br />t <br />w <br />a <br />PRELIMINARY <br />PROJECT COST ESTIMATE <br />FOR BRACKISH WATER DESALTING IN MEXICO <br />30,000 AF /YEAR (37 X 106M3) <br />(ALL COSTS IN 106 1993 DOLLARS) <br />BRACKISH WATER R O DESALTING PLANT <br />WATER TRANSMISSION /PUMPING <br />POWER GENERATION AND /OR TRANSMISSION <br />MISC. INFRASTRUCTURE <br />ADMIN /LEGAL /INTEREST (15 %) <br />ENGINEERING <br />FEASIBILITY STUDY <br />PRE DESIGN STUDY <br />DETAIL DESIGN <br />CONSTRUCTION SERVICES <br />$ 120 <br />60 <br />20 <br />20 <br />SUB TOTAL = $ 220 <br />$ 35 <br />$ 4 <br />8 <br />20 <br />20 <br />SUB TOTAL = $ 52 <br />SUB TOTAL PROJECT COST = $ 307 <br />TABLE 7 <br />30% CONTINt,. ;ENCY = 93 <br />ESTIMATED COST = $ 400 <br />Carollo Black & Veatch <br />