Laserfiche WebLink
Application of Pueblo, 01CW160 <br />Water Division 2 <br />Union Street Bridge: The Union Street bridge crosses the Arkansas River <br />in Pueblo in the SE1 /4 of the SW1 /4, Section 36, T. 20 S., R. 65 W., of <br />the 6`h P.M., at points approximately 968 feet North of the South Section <br />line and 2,320 feet East of the West Section line of said Section 36 <br />Moffat Street Chute (Structure 91: The Moffat Street Chute is a structure <br />in the Arkansas River channel located in the SW 1/4 of the NW 1/4, Section <br />6, T. 21. S., R. 64 W., of the Oh P.M., at a point approximately 1,684 feet <br />South of the North Section line and 287 feet East of the West Section line <br />of said Section 6. <br />The location map attached to and incorporated in this Decree as Exhibit 1 <br />identifies the general location of the Whitewater Park and the control structures. <br />The precise location of Structures 2-8 as constructed may be slightly different <br />from the locations depicted in Exhibit l.. <br />C. Source. The source of the RICD Water Right for the Whitewater Park is <br />the Arkansas River and its tributaries. <br />D. Appropriation information: <br />Date of initiation of appropriation: May 15, 2000. <br />ii. How appropriation was initiated: By formation of the requisite <br />intent to appropriate coupled with actions manifesting such an intent <br />sufficient to put third parties on notice, including but not limited to the <br />development and publication of a request for proposals concerning initial <br />design and engineering work for the Whitewater Park. Additional such <br />actions include, but are not limited to, Applicant's acquisition of lands or <br />rights to use lands for the Legacy Project; authorization by the Pueblo <br />City Council of applications for grants and funding assistance for the <br />Legacy Project; preparation of reports, design drawings, and engineering <br />work relating to construction of the Whitewater Park; authorization and <br />appropriation of funds by the Pueblo City Council for the preparation and <br />filing of the application; and the filing of this application and associated <br />notifications. <br />iii. Date water applied to beneficial use: Not applicable — conditional <br />water right. <br />E. Amount claimed: The following amounts, in cubic feet of water per <br />second of time ( "cfs ") are herein decreed as a conditional RICD water right for <br />each of the specified time periods for each of the structures that make up the <br />Whitewater Park: <br />11 <br />