Laserfiche WebLink
Summary of Scenarios <br />Notes: <br />(1) 360 months of simulation (30 years) <br />(2) Scenario PO is "existing" conditions, including fish hatchery returns below the Above Pueblo gage and existing PBWW diversion location. <br />Scenario P12 is "future" conditions, with fish hatchery flows included in the Above Pueblo gage and the PBWW diversion <br />directly from Pueblo Reservoir <br />02/03/2002 <br />pbl_inst POP12v <br />Minimum <br />Curtailments <br />Total <br />Flow <br />Requirement <br />CSU <br />PBWW <br />FVA <br />Number <br />Average <br />Number <br />Average <br />Number <br />Average Number Average <br />I <br />of <br />Annual <br />of <br />Annual <br />of <br />Annual of Annual <br />Above <br />Scenario <br />Pueblo Gage <br />Months <br />(ac -ft) <br />Months <br />(ac -ft) <br />Months <br />(ac ft) <br />Months (ac -ft) -T <br />PO <br />P12 <br />0 <br />100 <br />0 <br />55 <br />0 <br />3,250 <br />0 <br />26 <br />0 <br />.608 <br />0 <br />23 <br />0 0 0 <br />71 55 3,929 <br />Notes: <br />(1) 360 months of simulation (30 years) <br />(2) Scenario PO is "existing" conditions, including fish hatchery returns below the Above Pueblo gage and existing PBWW diversion location. <br />Scenario P12 is "future" conditions, with fish hatchery flows included in the Above Pueblo gage and the PBWW diversion <br />directly from Pueblo Reservoir <br />02/03/2002 <br />pbl_inst POP12v <br />